5
•
Using a funnel fill both legs with sand.
Use approximately 20 Lbs. of sand in each leg.
FILL LEGS WITH SAND
USING A FUNNEL
STEP 5
STEP 6
•
Put ladder aside for now and install handrails
(AC HANDRAIL) onto platform (AC PLATFORM).
•
Lay one handrail on flat surface and push the
connected dowels of the platform into the openings
on the handrail until fully seated. Make sure treads
of platform are facing upward.
•
Before attaching second handrail, make sure that
the longer part of the handrail is facing in the same
direction on both handrails. Repeat above for
installation of second handrail.
•
Center locking cap (
832402LC
) over
opening on
side of handrail where platform was
just attached.
Using a rubber mallet or a
hammer and a small
piece of wood, tap on cap
until the cap is flush
with the handrail
•
Repeat for each of the remaining (3) locking
caps.
•
Coat the tops of the legs with lubricant and attach
handrails by pushing them down over the legs.
Secure with (4) #10 1-1/4” screws through each
of
the pre-marked openings.