background image

B

C

Ф6  drill bit

4x30mm screws

A

12-15mm

from bath 

    edge

Ф3 drill bit

4x10mm screws

D

E

F

G

: Position the wall profile (No 1 ) onto the bath , approxi

m

ately 12-15mm from the outside bath edge (Diagram A). 

 

: Level the profile with a spirit level, then mark the position using a pencil through the 3 pre-drilled screw holes in the

            wall profile,drill the marked points using a 6mm masonry drill bit. Once this is done insert 3 wall plugs(No.2) (Diagram B). 

NOTE 

:Y

ou may find it easier to mark and drill the wall if you apply masking tape to it first.

: Secure the wall profile using 3 x ST4X30 screws (No.

4

) (

D

iagram C).

Step 4 : Push the bath screen assembly onto the wall profile (Diagram D). Ensure the bottom rail holder sits in the middle of 

   the

   groove of the end cap on the bottom arm rail.(Diagram E)

Step 5 : Drill 3 equally spaced holes with a 3mm drill bit through the wall profile into the frame(Diagram F)

Step 6 : Fix the bath screen assembly to the wall profile using the screws ST4 x10 (No.6). (Diagram G)

Step 1

Step 2

Step 3

Summary of Contents for venturi 6 AQ9357LS

Page 1: ...proficient person The fitting instructions should be followed carefully to ensure a proper and safe installation Failure to follow these instructions could result in future injury These instructions and list of parts assume that installation is done against solid tiled walls Please check this product for damage prior to starting the installation No claims can be made after the product has been fit...

Page 2: ...7 8 9 10 11 12 14 15 16 17 18 13 Screw M6x12 x2 x1 No Qty No Qty 1 Wall Profile 1 11 Arm Rail 1 2 Wall Plug 3 12 Bath Screen Assembly 1 3 Bolt 2 13 Fixing Screw M6x12 1 4 Fixing Screw ST 4x30 3 14 Cover Cap For Rail Holder 1 5 Cover Cap 3 15 Rail Holder Fixing 1 6 Fixing Screw ST 4x10 3 16 Washers 2 7 Cover Cup 3 17 1 8 Washer A 1 18 End Cap 1 9 Washer B 1 10 Bubble Seal For Arm Rail 1 Description ...

Page 3: ...is is done insert 3 wall plugs No 2 Diagram B NOTE You may find it easier to mark and drill the wall if you apply masking tape to it first Secure the wall profile using 3 x ST4X30 screws No 4 Diagram C Step 4 Push the bath screen assembly onto the wall profile Diagram D Ensure the bottom rail holder sits in the middle of thegroove of the end cap on the bottom arm rail Diagram E Step 5 Drill 3 equa...

Page 4: ...ll profile channel Diagram I then you can open close the bath screen 24 HRS DO NOT USE THE ENCLOSURE FOR 24 HOURS AFTER SEALING Applying Silicone Sealant Sealing Inside Seal from the top of the wall profile to the bottom on the INSIDE between the wall profile and the wall IMPORTANT Do not apply sealant on inside of the bath Sealing Outside Seal from the top of the wall profile to the bottom betwee...

Page 5: ...o Riverside Business Park Royd Ings Avenue Keighley West Yorkshire BD21 4AF 01535 613830 Technical 01535 613830 Fax 01535 613831 ...

Reviews: