background image

15

cleaning the unit

The exterior surfaces of the Aquafine UV unit should
be kept clean as part of routine maintenance. Use a soft
cloth with soap and water or any commercial stainless
steel cleaner. Avoid scratching the Lexan instrument
window.

LED status display panel

Monitor the Status Display LED Panel daily.
Immediately replace any failed UV lamp.

UV lamp replacement

Replace UV lamps after 8,000 hours of use.

THIS IS BASED ON NO MORE THAN 3 ON/OFF
POWER CYCLES PER 24 HR. PERIOD.

Please follow the operating requirements outlined in
the warranty section of this manual.

Premature lamp failure or lamp life deterioration can
be expected if the UV unit is cycled on/off more than
three (3) times a day. To replace the lamps, follow the
procedures on page 10.

The Colorguard™ ultraviolet lamps are rated for 8,000
hours of continuous use or 24 months of intermittent
use, whichever comes first. After this time, the lamp
glass will photochemically change and no longer allow
sufficient 254-nm shortwave UV, the germicidal ray of
the lamp, through the glass to effectively kill bacteria.

Failure to replace the ultraviolet lamps on a timely
basis of at least once every 8,000 hours may cause the
equipment to fail. With intermittent use, in no case
should the ultraviolet lamp be used for more than 24
months of operation without replacement, regardless of
the number of hours of operation, due to normal
operational degradation of the UV lamp.

CAUTION! Prior to remov-

ing the cover to access the

lamps and quartz sleeves,

you must release all pres-

sure to the UV treatment

chamber.  Drain the cham-

ber if required. Do not stand in a direct

line with the end of the unit; observe

from the front or back of the unit.

quartz sleeve cleaning

& replacement

As water passes through the ultraviolet treatment unit,
minerals, debris and other substances in the water will
settle and deposit onto the quartz sleeve. This will
impair the ability of the ultraviolet rays to penetrate the
water.

If the water has been processed through deionization,
reverse osmosis, or distillation, the cleaning frequency
can be set at once per year. If clear, fresh water is used,
the probable cleaning frequency will be anywhere from
once every thirty days to once every six months. You
can determine this cleaning frequency. This is done by
visually inspecting any one quartz sleeve to see if any
debris or film has settle on the outside of the quartz
sleeve.

Recent studies have shown that degradation of the
quartz sleeve from continuous exposure to UV reduces
the amount of UV radiation transmitted into the water
stream. Based on these findings, we recommend the
annual replacement of the quartz sleeves in addition to
routine cleaning.

cleaning the quartz sleeves

Visually inspect a quartz sleeve thirty days after use to
see if any debris or film has settled on the outside. If
dirty, use the cleaning  procedures that follow.

Summary of Contents for MP-2-SL

Page 1: ...s imperative that those responsible for the installation of this equipment as well as operating personnel read this manual and carefully follow all instructions and guidelines EQUIPMENT OPERATORS AND...

Page 2: ......

Page 3: ...eves 9 Installing the UV Lamps 10 Powering Up the Ultraviolet UV Unit 11 Monitoring Devices 11 UV Lamp Operational Display Panel 11 Running Time Meter 11 S 254 UV Optical Sensor 12 Setting the UV Mete...

Page 4: ...comply may result in severe or fatal electrical shock 6 Install the unit away from undue vibration that can damage the electrical components and UV lamps 7 Ensure all water connections flanges and co...

Page 5: ...bine the electrical components and the treatment chamber in one integral unit SL 10A This unit mounts vertically Inside the cabinet housing are the ballast and the UV treatment chamber The housing has...

Page 6: ...ed or repaired our option and returned to sender prepaid Before returning any part contact Aquafine Corporation for return authorization and shipping instructions This guarantee is void if the equipme...

Page 7: ...verheat problems described above where to install the unit Install the UV treatment unit in a horizontal position in a sheltered area with ample ventilation Ambient temperatures surrounding the unit s...

Page 8: ...e contact your local Aquafine represen tative or the factory directly wiring the unit A 1 2 conduit knockout 7 8 dia has been provided to attach a field installed junction box This box should be direc...

Page 9: ...8 plumbing schematic for all SL series ultraviolet treatment units MOUNTING BRACKET 2PLACES LED UV LAMP OPERATIONAL DISPLAY PANEL RUNNING TIME METER ModelSL 10A Service clearance required on this end...

Page 10: ...and o ring by placing the o ring into the internal relief of the compression nut below the threaded area The o ring should fit into the compression nut 9 Place the compression nut and o ring onto the...

Page 11: ...base into the rubber socket Push until you feel a firm bottomed out connection 8 Carefully slide the rubber boot portion of the lamp socket over the end of the lamp CAUTION DO NOT INSERT UV LAMPS WITH...

Page 12: ...hrough the system ensure there are no system leaks and no piping connection leaks All earth ground connections are properly made All lamp connections are properly made 1 Verify that all incoming power...

Page 13: ...lves Dry relay contacts are rated as follows 0 52 AMP 120 VAC 0 25 AMP 240 VAC If your application requires higher contact ratings use a slave relay Connection of peripheral equip ment is the responsi...

Page 14: ...empera turefallsto100 F 38 C HIGH TEMPERATURE HT UNITS The device automatically turns the UV lamps off when the water temperature reaches 170 F 77 C and auto matically turns the UV lamps back on when...

Page 15: ...r to one end of the lamp socket and the other end of the voltmeter of the opposite end of the lamp socket 7 Turn power on to the UV unit 8 Record the reading 9 Turn power off 10 Listed below please fi...

Page 16: ...less of the number of hours of operation due to normal operational degradation of the UV lamp CAUTION Prior to remov ing the cover to access the lamps and quartz sleeves you must release all pres sure...

Page 17: ...onnect ballast 9 Restore the power to the UV unit by turning the unit isolator switch to the ON position or by closing the upstream switch or breaker measuring performance Every UV treatment unit shou...

Page 18: ...or three and one half minutes reduce the flow to a reasonable stream of water not less than 50 of full flow Continue flowing to drain three additional minutes 4 Remove any temporary tubing used for fl...

Page 19: ...EPDM 4253 Viton 16458 Chemraz White 16600 Silicone 12967 2 LampSocket 16184 3 Running Time Meter 120 Volt 15843 4 Running Time Meter 240 Volt 15844 COMMON TO ALL SL 1 MP 2 SL APPLICATIONS 5 Quartz Sl...

Page 20: ...eduction Applications Size 15 Length 3052 14 ValidatedUVLampsDE185nmYellow TOC Reduction Applications Size 15 Length 16715 15 Quartz Sleeve 3150 16 Ballast 120Volt 4035 17 Ballast 240Volt 3493 18 Comp...

Reviews: