background image

HiQu Digital Bath

installation instructions

Page 5

Installation of Digital standard processor (for balanced high pressure and
unvented systems, combination boiler systems and separately pumped
gravity systems)

Pressures: The HiQu Digital standard bath system is designed to operate up to a maximum static pressure of
700kPa ((7 bar)(100psi)). Where pressures are likely to exceed 700kPa ((7 bar)(100psi)), a pressure reducing valve
must be fitted to the incoming mains supply. A setting of 400kPa ((4 bar)(60psi)) is recommended. It should be
noted that daytime pressures approaching 600kPa ((6 bar)(80psi)) can rise above the stated maximum overnight.

Special notes for combination boiler systems

The appliance must have a minimum domestic hot water rating of 24kW (80,000BTU) and be of the type fitted
with a fully modulating gas valve. If in any doubt, please contact the appliance manufacturer before installation
commences.

PLEASE NOTE: DUE TO PERFORMANCE CHARACTERISTICS OF COMBINATION BOILERS, SEASONAL INLET TEMPERATURE
CHANGE WILL AFFECT THE PROCESSOR OUTLET FLOW RATE RESULTING IN VARYING BATH FLOW RATE. THIS WILL AFFECT
PRE-SET DEPTH LEVELS. INLET TEMPERATURE CHANGE MAY ALSO CAUSE THE TEMPERATURE LED’S TO FLASH; THIS IS NOT
NECESSARILY CHANGING THE OUTLET TEMPERATURE.

Special notes for separately pumped gravity systems

We recommend a twin ended pump with a MINIMUM pump rating of 1.5 bar. For optimum performance a twin
ended 2.5 bar pump should be used.

The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons).
The capacity of the hot water cylinder must be capable of meeting the anticipated demand.

THIS PRODUCT IS NOT SUITABLE FOR USE WITH A SINGLE ENDED PUMP.

Connections

This product incorporates ‘push fit’ type connections. Tube should be cut using a rotary type cutter and lubricated
using a silicone-based lubricant or petroleum jelly (Vaseline or similar) prior to insertion into the fitting.

If plastic pipe is used, the tube insert must not increase the tube diameter or extend the cut-off length by more than
2mm.

TO MAXIMISE FLOW RATES WE RECOMMEND USING COPPER PIPE WITH THE MINIMUM AMOUNT OF ELBOWS. THESE
FITTINGS ARE NOT SUITABLE FOR STAINLESS STEEL TUBE.

Pipe sizing

Long pipe runs, on both inlet and outlet, will reduce the flow rate at the shower head. If long pipe runs are
unavoidable, use copper pipe rather than plastic. If plastic pipe is used, minimise the number of elbows as the pipe
inserts are very restrictive, consideration should be given to using 22mm plastic or copper pipe.

Flushing

Some modern fluxes can be extremely corrosive and, if left in contact, will attack the working parts of this unit. All
soldering must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply
Regulations prior to connection of the product.

After installation

Familiarise the end user with the HiQu Digital bath operation and hand them this guide. Complete and post the
guarantee card or register online at www.aqualisa.co.uk

Summary of Contents for HiQu

Page 1: ...HiQu Digital Bath installation instructions Page 1 HiQu Digital Bath Installation guide...

Page 2: ...HiQu Digital Bath installation instructions Page 2 HiQu Digital Digital Bath HiQu Digital Bath...

Page 3: ...Components HP Combi Literature not shown Literature not shown Components Gravity Pumped HiQu Digital Bath installation instructions Page 3...

Page 4: ...rthed Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of service and maintenance purposes Ensure that the conduit is...

Page 5: ...n ended 2 5 bar pump should be used The minimum actual capacity of the cold water storage cistern should be not less than 225 litres 50 gallons The capacity of the hot water cylinder must be capable o...

Page 6: ...t is essential that the written in structions overleaf are read and understood and that you have all the necessary components shown overleaf before com mencing installation The HiQu Digital Bath syste...

Page 7: ...indicate direction of flow Compression fittings should not be used on the inlet and outlet spigots and may affect warranty if fitted Choose the position for your Digital processor as close to the bath...

Page 8: ...y pipes 5 The maximum hot water inlet temperature must be no more than 65 C Attach the supply pipes to the Digital processor ensuring that the cold and hot feeds are fitted into the appropriately mark...

Page 9: ...set aside 8 Place the bath control back plate onto the finished wall surface in the desired location and mark the fixing and data cable entry points 9 Connect the data cable to the rear of the control...

Page 10: ...BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED THE ELECTRICITY SUPPLY MUST BE TURNED OFF AT THE MAINS SWITCH ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON Connect the outlet pi...

Page 11: ...recommend protecting surface mounted cables in suitable ap proved conduit to avoid the risk of damage from vermin The data cable and power lead should also be clipped in place with P clips or similar...

Page 12: ...N BOILER SYSTEMS For Standard Digital processors installed on combi boiler systems for op timum performance we recommend setting the flow rate to the COMBI mode 18 N B The ECO flow rate mode should no...

Page 13: ...t bladed screwdriver using the MAX TEMP ADJUSTMENT control as indicated When the temperature has been set to the desired position carefully replace the Digi tal processor lid and secure the fixing han...

Page 14: ...purposes The company reserves the right to alter change or modify the product specifications without prior warning Registered Trademark Aqualisa Products Limited The Waste Electrical and Electronic E...

Reviews: