7
Isolating valves
A suitable full bore isolation valve must be fitted to the
incoming supply in accordance with the current Water Supply
Regulations and our terms of warranty.
Siting
Refer to positioning guideline.
The Quartz™ Electric unit must
be mounted on a flat, vertical finished wall with the hose outlet
pointing downwards. Any distortion of the back plate may result
in the unit not working. Spacers are provided and are attached
to the service tunnel. If required, these can be used to enable the
unit to be fitted to an uneven wall surface, if required.
DO NOT tile up to the unit or apply silicone. The shower is spaced off the
wall by integral pillars to allow air circulation around the unit.
•
!
The casing must not be sited where it is subjected to continuous
spray from the shower head. The Quartz™ Electric should not
be sited in any situation where it is likely to freeze.
WARNING DO NOT SWITCH THE SHOWER ON IF THERE IS A
POSSIBILITY THAT THE SHOWER COULD BE FROZEN. If you
have switched the shower on, SWITCH OFF IMMEDIATELY.
Please refer to the trouble shooting guide.
Water pressure
Check that the dynamic (running) water pressure to the
Quartz™ Electric is adequate. Using the pressure test
adaptor provided, follow the pressure test adaptor fitting
and user instructions to ensure the water pressure to the
shower is within the minimum and maximum requirements.
Summary of Contents for Quartz Electric
Page 1: ...QUARTZ ELECTRIC INSTALLATION AND USER GUIDE ...
Page 35: ...35 ...