• The Waterfall Spillway
should be level from side
to side and tilt forward a
¼ bubble on a 2' level.
• Place two larger
boulders on either side
of the waterfalls you
are creating in order to
“frame” the waterfall.
The water will be running between the two larger boulders
you’ve set in place.
• You can now begin to stack the rocks between the two
larger boulders. These are the rocks that the water will be
running over, so take your time and be creative. Start with
the larger rocks on the bottom and work your way up to
the smaller ones on top.
• Small stones and gravel can be used to fill in the gaps
between the larger waterfalls stones.
STEP 14
HOOK UP AND LEVEL THE WATERFALL SPILLWAY
• Fold liner over top of Waterfall
Spillway. It is recommended
to provide some slack in the
liner in case the position of
the Waterfall Spillway needs
minor adjustment during
installation.
• Use a screw driver or awl,
puncture a small hole in the
liner through the center of the
Waterfall Spillway bulkhead.
This will be your reference
point for the location of the
liner connection.
•
Unfold the liner back off the
Waterfall Spillway and remove
the retaining nut from the
Waterfall Spillway bulkhead.
Center the retaining nut over
the puncture hole in the liner.
Use a pen, marker, or sharp
tool, to trace a line around the
inside of the nut.
17
☎
CAN 1-866-766-3426 |
☎
US 1-866-877-6637
Summary of Contents for DIY Waterfall Kit
Page 1: ...DIY Waterfall Kit INSTRUCTION MANUAL ...
Page 21: ...STEP 20 ENJOY 21 CAN 1 866 766 3426 US 1 866 877 6637 ...
Page 43: ...ETAPE 20 À VOUS D EN PROFITER MAINTENANT 43 CAN 1 866 766 3426 US 1 866 877 6637 ...
Page 65: ...PASO 20 DISFRUTE 65 CAN 1 866 766 3426 US 1 866 877 6637 ...
Page 68: ...86240 Rev 1 16 2015 Aquascape Inc All Worldwide Rights Reserved ...