16
www.
AQUASURE
USA
.com
818 N Mountain Ave #203c, Upland, CA 91786 | 800.661.0680 | support@aquasureusa.com
1.
Turn on the feed water adapter valve and
cold water supply valve to allow the water to
pass through. (See Diagram J-1)
2.
Turn on the FLOWLOK™ valve to allow the
water to enter the system. (See Diagram J-2)
3.
Turn on the Tank Ball Valve lever parallel to
the tubing connection to allow the water to
enter the tank. (See Diagram J-3)
4.
Wait 2 to 3 hours for the water storage tank
to fill. The system will automatically shut off
once the tank is full.
5.
Check for leaks! The system is now filled
with water and pressurized.
6.
Drain out the first tank of water by turning
on the dispensing faucet. Have the water
run till it becomes a slow stream of water, or
when it starts to trickle. (See Diagram J-4)
STEP 7.
System Startup
WARNING!
Immediately shut off the cold water supply valve or main water supply valve if there are
leaks. Check the leak area and see if there’s a loose connection or if more Teflon tape is needed to
prevent leaks from happening.
Dia. J-1
Dia. J-2
Dia. J-3
Dia. J-4
Summary of Contents for AS-PR100E
Page 1: ...PREMIER SERIES DRINKING WATER SYSTEM OWNER S MANUAL FOR MODEL NO AS PR50S AS PR75A AS PR100P ...
Page 2: ......
Page 11: ...9 AQUASURE PREMIER SERIES ...
Page 23: ...21 AQUASURE PREMIER SERIES ...
Page 30: ......
Page 31: ......