Apply silicone to back, horizontal edge.
18
18
Fasten flanges along top of back wall with fasteners of choice (see Pre-Installation Planning #12) into each
corresponding stud. Pre-drill both (vertical) side flanges and fasten to side studs 8” (200mm) on center.
21
21
Check for level. Shim if necessary.
23
23
Level back wall vertically & horizontally. Shim if necessary.
20
20
Apply silicone along horizontal and inside vertical edge.
Slide side wall into position.
22
22
Lift and place back wall.
19
19