POH / AFM
AQUILA AT01-100C
Section 4
NORMAL PROCEDURES
Document Nr.:
Issue:
Supersedes Issue:
Date:
Page:
FM-AT01-1010-103
A.08
A.06 (01.06.2018)
25.05.2020
4 - 6
1.
Left main landing gear
a) Landing gear strut
Visual inspection
b) Wheel fairing
Visual inspection (refer to 7.11.4)
c) Tire pressure and slip marking
CHECK
d) Tire, wheel, brake
Visual inspection
e) Chocks (if in use)
REMOVE
2.
Fuselage
a) Fuselage shell
Visual inspection
b) Skid plate
Visual inspection
c) Tail tie-down
DISCONNECT
3.
Empennage
a) Elevator
Visual inspection
b) Horizontal stabilizer
Visual inspection
c) Rudder
Visual inspection,
CHECK: fitting and bolt
connection, proper control cable
connection and safe-tied.
d) Vertical stabilizer
Visual inspection
4.
Right main landing gear
a) Landing gear strut
Visual inspection
b) Wheel Fairing
Visual inspection (refer to 7.11.4)
c) Tire pressure and slip marking
CHECK
d) Tire, wheel, brake
Visual inspection
e) Chocks (if in use)
REMOVE
5.
Right wing
a) Entire wing surface (upper and under side) Visual inspection
b) Fuel vent
CHECK if clear
c) Flap
Visual inspection
d) Aileron and inspection window
Visual inspection
e) Wing tip, NAV lights and ACL
Visual inspection
f) Fuel level
CHECK
with
dipstick
(see
inner
surface
of
baggage
compartment
door) and verify with the indicated
fuel level on the fuel gauge cockpit
g) Fuel tank filler cap
CHECK if closed
h) Wing tie-down
DISCONNECT