background image

ELECTROMECHANICAL CONTROL PANEL 

 

Page 9 

4.

 

REGENERATION CYCLE

 

 

The  length  of  the  brine/slow  rinse  cycle  has  been 

preset;  it  should  only  be  adjusted  by  a  technical  service 
person.
 
 

 

Turn the timer knob (K) counter clockwise until the 
regeneration cams (I) are accessible; 

 

loosen the locking screw (H); 

 

rotate the upper cam: 
-

 

clockwise:  to  extend  the  cycle  time  (max.  60 
min); do NOT rotate the upper cam too far, the 
outer  edge  of  the  cams  should  form  1 
continuous section!  

 

 

-

 

counter  clockwise:  to  shorten  the  cycle  time 
(min. 30 min); 

 

secure the locking screw (H). 

 

Summary of Contents for Micro Budget

Page 1: ...2012 Aquion Inc OM EN MicroBudget Rev2012 03 O OW WN NE ER R S S M MA AN NU UA AL L Micro Budget WATER SOFTENER SYSTEM...

Page 2: ...CORD Serial Number ______________________________________________ Model _______________________________________________________ Water Hardness inlet ______________________________________ Water Hardne...

Page 3: ...hould only be undertaken by a competent person aware of the local codes in force All plumbing and electrical connections must be done in accordance with local codes Before setting up the water softene...

Page 4: ...oiler house or freezing temperatures can occur the water softener cannot be exposed to outdoor elements such as direct sunlight or atmospheric precipitation do not install the water softener too close...

Page 5: ...on treated water 1 Screw the elbow connections onto the control valve the long elbow onto the inlet port the short elbow onto the outlet port make sure to install the gasket seals Tighten the nuts fir...

Page 6: ...ontrol valve secure it by means of a clamp 2 Run the drain hose to the drainage system and connect it to the stand pipe assuring sufficient air gap This drain line operates under pressure so it may be...

Page 7: ...nical controller refer to section ELECTROMECHANICAL CONTROL PANEL INITIATE A REGENERATION 10 Manually initiate a regeneration refer to section ELECTROMECHANICAL CONTROL PANEL ADJUSTMENT RESIDUAL HARDN...

Page 8: ...1 Push in the skipper tab E that is aligned with the day indicator C 2 Turn the timer knob K counter clockwise until the time of day in the time of day window L equals the time of regeneration in the...

Page 9: ...e person Turn the timer knob K counter clockwise until the regeneration cams I are accessible loosen the locking screw H rotate the upper cam clockwise to extend the cycle time max 60 min do NOT rotat...

Page 10: ...s OPEN outlet valve from water softener is OPEN BYPASS POSITION inlet valve to water softener is CLOSED outlet valve from water softener is CLOSED MAINTENANCE POSITION inlet valve to water softener is...

Page 11: ...tool carefully push the salt to break it apart 3 pour warm water over the top of the salt to dissolve it BRINE CABINET To retain the appearance of the water softener simply wipe it with a damp cloth o...

Page 12: ...sive water in brine cabinet Refer to problem Excessive water in brine cabinet Water softener regenerates too frequently Verify regeneration frequency Excessive water in brine cabinet Improper setting...

Page 13: ...e restrictor Clean injector and or brine restrictor Plugged injector filter Clean injector filter Restricted drain line Verify drain line for kinks or restrictions Restricted brine line Verify brine l...

Page 14: ...sage per regeneration kg 0 5 0 8 Exchange capacity per kg salt m x f 41 Exchange capacity per kg salt m x d 23 Recommended maximum service flow m hr 0 4 0 6 Rinse water usage per regeneration 3 bars L...

Page 15: ......

Page 16: ......

Reviews: