- 8 -
Installation & Configuration
Power Input
Terminal Block
Power Output
Terminal Block
+ -
GND
+ -
GND
B. Connecting the SCP Cube to Your Industrial PC System
1. Connect the power input of your IPC to the power output of the SCP Cube.
2. Slide the
PWR OUTPUT VOLTAGE
switch on the SCP Cube to 24V or
12V according to the power input of the connected system.
3. To monitor the SCP Cube power status, connect the SCP Cube to your
industrial PC system via USB or COM port.
If you are using USB port, you need to install USB-to-COM port driver. See
next section for details.
C. Connecting the SCP Cube to power source
Connect the power input of the SCP Cube to the power source (DC 12~28V).
D. Grounding the SCP Cube
Remove the ground screw from the front panel. Then attach a ground wire to
the panel with the screw.
The following diagram illustrates a sample connection. Actual connection may
vary according to your industrial PC system.
Summary of Contents for SCP Cube
Page 2: ...II Revision History Version Date Description 1 0 2018 10 Initial release...
Page 4: ...ii Contents...
Page 10: ...viii This page is intentionally left blank...
Page 11: ...1 1 Chapter 1 Introduction Chapter 1 Introduction...
Page 15: ...5 2 Chapter 2 Installation Chapter 2 Installation Configuration...
Page 25: ...15 3 Chapter 3 Operation Mode Chapter 3 Operation Mode...