4
INDEX
1. GENERAL
PRESCRIPTIONS ........................................................................................................................6
2. TECHNICAL
CHARACTERISTICS AND OVERALL DIMENSIONS ...............................................................7
3. GASIFICATION TECHNOLOGY ....................................................................................................................8
4. MAIN
BOILER COMPONENTS......................................................................................................................8
4.1. WOOD
CHARGING CHAMBER .................................................................................................................................8
4.2.
MAIN BURNER REFRACTORY CEMENT FRAME AND BARS.................................................................................8
4.3.
HEAT EXCHANGE AREA AND CATALYST ELEMENTS ..........................................................................................8
4.4.
SMOKE DRAFTING PASS-THROUGH CHAMBER AND FAN...................................................................................9
4.5. COMBUSTION
AIR
DISTRIBUTION ASSEMBLY ......................................................................................................9
4.6.
HOT SANITARY WATER HEAT EXCHANGER .........................................................................................................9
4.7. EMERGENCY
HEAT EXCHANGER...........................................................................................................................9
4.8. TEMPERATURE
PROBES RECEPTACLES..............................................................................................................9
4.9. BYPASS
PUMP ..........................................................................................................................................................9
4.10. INSULATION ..............................................................................................................................................................9
5. INSTALLATION............................................................................................................................................10
5.1. INSTALLATION
IN A BOILER ROOM ...................................................................................................................... 10
5.2. EXTERNAL
HOUSING MOUNTING......................................................................................................................... 10
5.3. SYSTEM
EXPANSION TANK................................................................................................................................... 11
5.4. FLUE DUCT.............................................................................................................................................................. 11
5.5. EMERGENCY
HEATSINK RELIEF VALVE CONNECTION ..................................................................................... 12
6. ELECTRONIC
PANEL, RELEASE 2007 ......................................................................................................13
6.1. GENERAL
CHARACTERISTICS .............................................................................................................................. 13
6.1.1. DEFAULT ENDOWMENT ................................................................................................................................. 13
6.1.2. OPTIONAL ENDOWMENT................................................................................................................................ 13
6.2. DISPLAY................................................................................................................................................................... 13
6.3. OPERATION
ENVIRONMENTS ............................................................................................................................... 13
6.4.
SCHEMATIC DIAGRAM AND ELECTRONIC BOARD WIRING............................................................................... 14
6.5.
TEMPERATURE PROBES ELECTRICAL CONNECTIONS..................................................................................... 15
6.6.
BRACKET HARNESS WIRING ................................................................................................................................15
7. TEMPERATURE DISPLAYING, PARAMETERS CHANGING OR SETTING...............................................16
7.1.
PROBES ENABLING AND DISABLING (FUNCTION PARAMETER #1) .................................................................16
7.2.
BOILER AND ACCESORIES FUNCTIONAL SETTINGS (FUNCTION PARAMETER #2) ....................................... 17
7.3.
DISPLAY LANGUAGE SELECTION......................................................................................................................... 17
8. HEATING
ONLY OPERATION.....................................................................................................................17
8.1.
BOILER PARAMETERS SETTING “HEATING ONLY OPERATION”....................................................................... 18
8.2. PARAMETERS
DEFINITION
“HEATING ONLY OPERATION” ................................................................................ 18
8.3. HYDRAULIC CONNECTIONS.................................................................................................................................. 19
8.3.1. GENERAL CONNECTION DIAGRAM FOR HEATING ONLY OPERATION WITH OPEN EXPANSION
TANK ................................................................................................................................................................. 19
8.3.2.
GENERAL CONNECTION DIAGRAM FOR HEATING ONLY OPERATION WITH MIXING VALVE................. 20
8.3.3. GENERAL CONNECTION DIAGRAM FOR HEATING ONLY OPERATION WITH OPEN
EXPANSION
TANK/CLOSED EXPANSION TANK ................................................................................................................. 20
9. HEATING AND HOT WATER PRODUCTION WITH INTERNAL HEAT EXCHANGER ...............................21
9.1.
BOILER PARAMETERS SETTING “HEATING AND HOT WATER PRODUCTION BY MEAN OF AN
EXTERNAL TANK”.................................................................................................................................................. 22
9.2.
PARAMETERS SETTING “HEATING AND HOT WATER PRODUCTION BY MEAN OF AN EXTERNAL TANK”... 22
9.3. HIDRAULIC CONNECTIONS ................................................................................................................................... 23
9.3.1. GENERAL CONNECTION DIAGRAM FOR A BOILER WITH EXTERNAL HOT WATER PRODUCTION
TANK AND SOLAR PANELS ............................................................................................................................ 24
9.3.2.
GENERAL CONNECTION DIAGRAM FOR A BOILER WITH SOLAR PANELS AND CLOSED EXPANSION
TANK ................................................................................................................................................................. 24
10. BOILER OPERATION WITH PUFFER OR PUFFER COMBI .......................................................................25
10.1.
PARAMETERS SETTING “OPERATION WITH PUFFER OR PUFFER COMBI”..................................................... 26
10.2.
PARAMETERS DEFINITION “OPERATION WITH PUFFER OR PUFFER COMBI” ................................................ 26
10.3. HIDRAULIC
CONNECTION DIAGRAMS.................................................................................................................. 27
10.3.1. GENERAL CONNECTION DIAGRAM WITH PUFFER OR BOILER COMBI AND SOLAR PANELS ................ 28
10.3.2. GENERAL CONNECTION DIAGRAM WITH HEAT EXCHANGER, PUFFER OR BOILER COMBI AND
SOLAR PANELS ............................................................................................................................................... 28