3-49
3
5. Set the exhaust pipe in place; then install the muffler
and align the assembly to the engine. Install two cap
screws securing the exhaust pipe to the cylinder head
and tighten to 20 ft-lb.
6. Install the inlet boot on the V-belt housing; then
install the exhaust duct connecting the outlet housing
to the V-belt housing. Tighten all clamps securely.
HDX140A
PR144B
7. Connect the lower coolant hose to the water pump
housing; then connect the upper coolant hose to the
thermostat housing. Tighten the hose clamps
securely.
8. Install the starter wire on the starter and tighten the
nut securely; then connect the alternator connector
and gear position switch connector (XT).
PR838
PR266C
9. From the right-side, connect the speed sensor con-
nector, fuel level sensor connector, and temperature
sensor lead; then install the spark plug cap.
PR155B
PR130A
NOTE: Make sure the main harness ground and bat-
tery ground wires are installed and secured in the
proper location with the unpainted cap screw.
PR474B
Summary of Contents for 2013 Prowler XT
Page 1: ...Prowler XT XTX XTZ ...
Page 3: ......
Page 5: ......
Page 149: ...4 16 NOTES ...
Page 211: ...7 8 NOTES ...
Page 232: ...8 21 8 NOTES ...
Page 233: ... Printed in U S A Trademarks of Arctic Cat Inc Thief River Falls MN 56701 p n 2259 530 ...