6
Quick Start Guide: 720XP Series 2 RU Cognitive Campus Switches
Tools and Parts Required for Installation
Chapter 2: Preparation
•
Power cords can reach from the power outlet to the connector on the rear panel.
Important!
All power connections must be removed to de-energize the unit.
Toutes les connexions d'alimentation doivent être enlevées pour hors tension l'appareil.
Important!
This unit is intended for installation in restricted access areas.
Cet appareil est prévu pour une installation dans les zones d'accès restreintes.
2.2
Tools and Parts Required for Installation
The following tools and equipment are required to install the switch:
Two-Post Rack
•
Screws or rack mounting nuts and bolts.
•
Screwdriver
Four-Post Rack (Toolless)
No additional equipment required.
Accessory kit does not include screws for attaching the switch to the equipment rack. When installing
the switch into an equipment rack with unthreaded post holes, nuts are also required to secure the
switch to the rack posts.
2.3
Electrostatic Discharge (ESD) Precautions
Observe these guidelines to avoid ESD damage when installing or servicing the switch.
•
Assemble or disassemble equipment only in a static-free work area.
•
Use a conductive work surface (such as an anti-static mat) to dissipate static charge.
•
Wear a conductive wrist strap to dissipate static charge accumulation.
•
Minimize handling of assemblies and components.
•
Keep replacement parts in their original static-free packaging.
•
Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
•
Use tools that do not create ESD.