18
F
IG
. 5.11
A
M
OUNTING
P
UMP
G
ROUP
5.11 W
ALL
M
OUNTING
M
ODULES
The pump module is supplied with a wall bracket. The pump group must
be correctly fitted to the wall using the bracket supplied. It should not be
supported by the connecting pipework alone.
FITTING PROCEDURE
1.
Determine the best location for the pump group, take into consideration
the following:-
i Access for fill and drain.
ii Position of the expansion vessel.
iii Position of the PR Valve.
iv Provision has to be made for the discharge of the PR Valve
to be collected in a suitable container.
v Ease of plumbing to cylinder and collectors.
2.
Mark position for mounting bracket.
3.
Drill one holes for wall plug (if used).
4.
Screw on bracket to wall and level.
5.
Mount pump group onto bracket as shown in fig. 5.11a.
6.
Tighten Locknuts
See fig. 5.11A
Bracket
Wall Plug
Lock Nut
Lock Nut
Bracket