background image

ARITERM SWEDEN AB

 

 

Installation, Operation & Maintenance - 

2009.02.18- 12/20

 

ACTIONS CHART

TEMPERATURE

BOILER 55(80) °C

ON

(-OFF)

AUGER EXTERNAL

MANUAL OFF

OPERATINGMODE

MAX

TEMPERATURE

FLUE GAS xx °C

OPERATING TIME

press plus key

OPERATING TIME

TOTAL

OPERATING TIME

MAX

OPERATING TIME

MIN

OPERATING TIME

EL 1

PELLETS  STORE

press plus key

SERVICE

press plus key

ESTIMATED TIME

LEFT   X d

PELLETS STORE

0,0 t

FEEDING FAKTOR 

0,0 kg/h

CONSUMPTION

AVERAGE 0,0 kg/d

CONSUMPTION

TOTAL 0,0 t

AUGER EXTERNAL

TOTAL XX h

ALARM PELLETS

MIN 0,0 t

ALARM

CLEANING 0( Xh)

FLUE GAS XXX °C

MAX           240°C

BURNER TYPE

50kW

POWER HIGH

AUGER 56%

POWER HIGH 

FAN 1 46%

POWER LOW

AUGER 56%

POWER LOW

FAN 1 46%

POWER MIN

AUGER 0%

POWER MIN

FAN 1 0%

SERVICE

EL STEP

0 (0)

LEVELMONITOR

XX (50%)

OPTICAL MONITOR

XX ( 50%)

TEST OUTPUTS

Press plus key

POWER

0

ENGLISH

ADDRESS

DEFAULT SEITINGS

v0906

DIFF TANK

NEJ

AUGER EXTERNAL

0

FAN

0

FAN 2

0

AUGER BURNER

0

IGNITION

0

ALARM

0

EL STEP

0

Service meny shows when 

pushing same time 

buttoms < and > for 5 sec.

MAIN MENU

SERVICE MENU

POWER MENU

Menu is only seen when 

OFF-set chosen..

FUEL

PELLETS

FUEL

P EL

FUEL

EL

AUGER EXTERNAL

TIME MAN. 15min

HOT STARTS

BURNER  X

COLD STARTS

BURNER  X

SEQUENCE

Not used!

ACTIONS CHART B 50 /  BeQuem 50 version 0906

CLEANING

FAN 2/h

HOLDING

TIME 60min

AUGER EXTERNAL

TIME 30s

OPERATING TIME

EL 2

POWER HIGH

FAN 2 64%

POWER LOW

FAN 2 64%

POWER MIN

FAN 2 0%

Power menu is available 

when nr. 0 is changed to 

nr. 5.

Move forward when nr. on 

display stops winking.

Fun must be in operation 

before function of the 

ignition element can be 

found.

Change nr. 0 to nr. 3 when 

El STEP using.

Electric heating is available 

when nr 3 is selected in EL 

STEP

 

menu. 

Only B function

Press right arrow to leave menu.

ALARM ASH 

REMOVE

X (  x)

Summary of Contents for BeQuem 50

Page 1: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 1 20 INSTALLATION OPERATION AND MAINTENANCE BeQuem 50 ...

Page 2: ...NG Delivery The manufacturer has insured the burner in case of damages during transport from the factory to the first interim storage location Upon delivery it is important to check the condition of the burner before the burner is taken into use If any damage is found the seller shall be notified thereof without delay for possible claims Storage The burner can be stored outdoors protected from rai...

Page 3: ...ntrol sensor 17 Chain 7 11 3 9 8 1 5 6 7 2 10 14 13 15 16 12 17 4 TECHNICAL DATA Performance Output using pellets Combustion efficiency Power of ignition resistor Normal power consumption 25 50 kW 95 450 W 90 W Dimensions Length outside the boiler Width outside the boiler Length inside the boiler Weight approx Smallest insertion opening width height Required combustion space above the combustion h...

Page 4: ...it can be ignited manually when necessary The electric ignition system of the burner will only be acti vated in case the temperature of the boiler has dropped at least 8 C below the target temperature During heating the necessary ignition cycles take place by means of em bers in the combustion head saving electric energy The burner and the incorporated feeding system operate automatically The oper...

Page 5: ...burner servicing Any condensation should be checked by visual inspection of the chimney s upper reach during various weather conditions In the event condensation runs through the flue a condensation vessel should be installed in the lower part of the chimney in order to tap off the condensation water Do not cover the combustion air intake ELECTRICAL INSTALLATION The supply cable delivered with bur...

Page 6: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 6 20 WIRING DIAGRAM ...

Page 7: ...ighten while making sure the plate is not deformed Final tightening of the service rail is to be done only once the burner has been attached and secured to the mounting plate The service rail is to be pressed up against the boilers guide pins and outer clamping bolts are to be securely tightened Check that the burner is cent red on the mounting plate s guide pins when it is pulled out and pushed i...

Page 8: ...me the operation light turns green and the speed of the fan decreases Feeding of fuel stops completely within three minutes in order to give time for the fuel to ignite in the combustion head After this pellets are fed at low power for further five minutes After a full stop lasting ten minutes 7 starts the operation program switches on and controls the burner functions Only until at this point the...

Page 9: ...ERATING TIME EL 2 POWER HIGH FAN 2 64 POWER LOW FAN 2 64 POWER MIN FAN 2 0 Power menu is available when nr 0 is changed to nr 5 Move forward when nr on display stops winking Fun must be in operation before function of the ignition element can be found Change nr 0 to nr 3 when El STEP using Electric heating is available when nr 3 is selected in EL STEP menu Only Biomatic function Press right arrow ...

Page 10: ... Operating time high Operating time at high power Operating time low Operating time at medium power Operating time min Minimum power level during operating time only displayed when the min operating level is activated Operating time electric el1 Operating time of the resistor 1 The number of electric resistors vary bet ween models Biomatic function Operating time electric el2 Operating time of the...

Page 11: ...by pressing the Plus button Description of menu 3 Power Power In order to activate this menu select number 5 in the Service Power menu by pres sing the Plus button Wait until the number stops flashing and continue by pressing the arrow but ton to the right Text on the display Description Setting possibilities Power 0 The menu is activated by entering code 5 Wait until the number stops flashing and...

Page 12: ...UTPUTS Press plus key POWER 0 ENGLISH ADDRESS DEFAULT SEITINGS v0906 DIFF TANK NEJ AUGER EXTERNAL 0 FAN 0 FAN 2 0 AUGER BURNER 0 IGNITION 0 ALARM 0 EL STEP 0 Service meny shows when pushing same time buttoms and for 5 sec MAIN MENU SERVICE MENU POWER MENU Menu is only seen when OFF set chosen FUEL PELLETS FUEL PELLETS EL FUEL EL AUGER EXTERNAL TIME MAN 15min HOT STARTS BURNER X COLD STARTS BURNER ...

Page 13: ...dy that the motor shaft rotates the auger and the motor of the external auger operates In most cases the default setting of the operating time of the external auger 30 seconds is not long enough to bring suf ficient amount of pellets to the burner If the problem cannot be removed by me ans of the above checks and remedies the operating time of the external auger may be too short In such cases incr...

Page 14: ...not detected light du ring a certain period of time No fuel has entered into the combus tion head is there fuel in the upper connection If there is no fuel in the upper con nection of the burner check the cable connections of the level switches If this does not help wipe the level swit ches clean If the external feed of the burner does not start in spite of this or the level switches must be clean...

Page 15: ...es stuck together in the combustion head in good time Such particles must absolutely be removed from the combustion head at short intervals to prevent over heating of and thus dama ge to the primary air ring Sintering is often caused by impurities in the fuel and the fuel supplier shall be notified immediately of such problems See also paragraph Advice about fuel pellets Note Handle ash always car...

Page 16: ...ews within the cup must be carefully cleaned to ensure flawless operation Pull the flame control sensor gently out of the pipe Clean the flame control sensor Clean the flame controller metal pipe so that the ash in the pipe will not hinder the operation of the flame control sensor MAINTENANCE CARE SWEEPING Check the condition of the chain and wheels regularly Change worn out parts when necessary ...

Page 17: ... must be taken into consideration FUEL RECOMMENDATION Raw material Chemically untreated barkless wood Diameter 8 mm Length 15 to 32 mm Volume weight over 600 kg m3 Moisture content less than 10 Ash content less than 0 7 weight Fine material content max 4 weight Melting temperature of ash 1100 C Energy content 4 75 kWh kg ADVICE ABOUT FUEL PELLETS Actions in emergency situations Fire If the heating...

Page 18: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 18 20 DECLARATION OF CONFORMITY NOTES ...

Page 19: ...water reaches desired temperature boiling risk If these instructions are not followed during installation operation and maintenance the obligations of Ariterm AB under the warranty regulations are no longer binding Ariterm reserves the right to alter any details and specifications without prior notice Flue gas temp High CO O2 CO2 Air fuel ratio Efficiency Draught i mm Fan Effect Flue gas temp Low ...

Page 20: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 20 20 Ariterm Sweden AB Flottilvägen 15 39241 Kalmar Sweden www ariterm se 46 480 442850 ...

Reviews: