background image

24

2014-03-03 / 06

 

NOTES

Summary of Contents for BioCompPX

Page 1: ...For a sustainable future INSTALLATION AND USER INSTRUCTIONS BioCompPX ...

Page 2: ...g 4 Technical data 5 Dimensions 6 Installation of the boiler 7 Pipe installation 8 9 Electrical installation 10 11 Connection box 12 Installation of the burner 14 Commissioning 15 Service decommissioning 16 18 Declaration of conformity 19 Standard equipment 20 Installation report 21 Warranty 23 ...

Page 3: ...the boiler together with the ash blown out of the burner pipe The ash can be removed through a hatch at the bottom of the front and through 2 hatches one at the bottom of each side An immersion heater can be installed as an accessory on either side The immersion heater is connected to its own separate electricity supply and has a thermostat and overheat protection The output is 3 6 kW The boiler h...

Page 4: ...termediate storage location It is important that the recipient of the boiler checks the boiler s condition before accepting the delivery In case of damage the transport company must be contacted immediately Storage The boiler can be stored outside protected against the rain It is however best to store the boiler indoors Unpacking Check that all parts on the equipment list are present after removin...

Page 5: ...or switch 220 240 Vac 50Hz 350W Load on heating surface kW m2 11 1 Size of burner opening mm x mm 250x250 Size of flue Ø mm 139 Required underpressure Pa 5 Smoke Gas Temperature nominal effect 60 kW C ca 140 Smoke Gas Temperature min effect 18 kW C ca 85 Pressure drop acrossthe boilerwater connections 26 mbar 2 5m3 h 107 mbar vid 5 2 m3 h Supply return connection DN 50 Connection for expansion DN ...

Page 6: ...QQOJOH IÚHFS FMMFS WÊOTUFS TJEB 4FSWJDFMVDLB 4ZOHMBT 4PUTLÌQ NFE LPOWFLUJPOTSFOHÚSOJOH TLMVDLB 3FOHÚSJOHTMVDLPS POWFLUJPOTSFOHÚSJOH NPUPS PUPS UJMM BTLTLSVW UJMMCFIÚS TLTLSVW UJMMCFIÚS 3ÚLLBOBM NN POUSPMMQBOFMFO IBS FO EJTQMBZ PDI JTQMBZFO WJTBS ESJGUMÊHF PDI BLUV ÚSLMBSBOEF UFYU SVMMBS J EJTQMBZF VTUFSJOHTSBUUFO BOWÊOET HFOPN BO WSJEFS GÚS BUU WÊYMB J NFOZO FO KVTUFSJOH UU USZDL WÊMKFS FMMFS DIME...

Page 7: ...s from the BioCompPX gives rise to a risk of condensation in the chimney Make sure the chimney is well ventilated with the help of draught diverter inhibi tor The chimney flue should be stainless steel or acid proof Ensure that the chimney connec tion boiler flue to chimney connection is air tight since during certain operating cases there could be an over pressure after the boiler flue legend 25 ...

Page 8: ...r is delivered with integrated overheat protection However a safety valve must be in stalled close to the boiler If the return water temperature is too low it can result in a risk of corrosion Make sure the low est return water temperature is approx 60 C during operation Example of installation 1 ARITERM BIOCOMP PX 2 3 WAY VALVE RADIATOR HEAT 3 HEATING SYSTEM PUMP RADIATOR HEAT 4 RADIATOR HEATING ...

Page 9: ...out of the pipe under pressure Expansion tank The size of the expansion tank is determined as follows Closed system according to the instructions from the expansion tank s manufacturer System volume boiler volume hot water heater volume pipe volume radiator volume Production of hot tap water There is an efficient flat heat exchanger for tap water in the boilers in the BioComp series so generally s...

Page 10: ...confirm and the burner starts If you turn one step clockwise instead you jump to the main menu and come to Start T Turn further to arrive at Stop T User menu and Back respectively Start T This is where you set the desired start temperature Stop T This is where you set the desired stop temperature User menu This is where you adjust the time and temperature settings To be able to perform more advanc...

Page 11: ...2 3 4 5 IN Temp 1 Temp 2 Com 1 Com 2 1 2 5 4 3 P 1 N PE L U B N Y B svart N brun U VVP VVP PB PB 4 1 2 3 PB B GR PTG PTG Temperaturgivare pannvatten B 4 M M N U Y N F F U Y N B 1 2 3 N Colors B black U blue N braun Y yellow green GR grey VVP Circulation pump hot domestic water PB Pellet burner PTG Temperature sensor boiler water M Motor for convection cleaning F Fan motor ...

Page 12: ...n the two securing screws on the bottom edge of the boiler s front panel 2 Loosen the front panel s securing screws on the top of the boiler 3 Connection box for soot removal motor 10 and heat exchanger pump 11 CONNECTION BOX ...

Page 13: ...eset in hours or minutes 5 View Jump to View Menu TachoAct 000 999 Tachometer readings from fan 6 ClockSet Back Back 6 ClockSet 3 Settings 00 00 Set Time HH MM SetCode 21 01 01 01 Set Date YY MM DD 4 Service Back Ign dose 70 010 240 Ignition dose in seconds TstDose Testing of ignition dose Feed HI 10 9 0 20 Feeder HI Power mode in seconds Feed LO 7 2 0 20 Feeder LO Power mode in seconds Feed MIN 4...

Page 14: ...e height of the run ners afterwards Connect the cables on the side of the burner INSTALLATION OF THE BURNER 1 Installation of the immersion heater 2 Installation of the thermostat Electrical operation An immersion heater 6 or 9 kW can be installed in the boiler in the DN 50 connection on the side closest to the front of the boiler 14 The immersion heater is delivered together with an adjustment ov...

Page 15: ...en the burner fan and the boiler flue gas fan so the underpressure in the hearth is 15 25 Pa The underpressure gauge is connect to the Ø6 mm copper tube on the top of the boiler to the left of the tap water pipes The flue gas fan is adjusted separately for each output mode AirHi 2 AirLo 2 and AirMin 2 Daily operation and daily maintenance The daily operation of the boiler depends on the wood pelle...

Page 16: ...h sealing change if necessary Inspection Once a month Removal of ash from burner At the same time as the ash is removed from the hearth Use of a fuel rich in ash naturally increases the quantity of ash and thereby shortens the serv ice interval Service intervals The service intervals given are guide values and can vary considerably depending on the wood pellet quality used and the load Check the b...

Page 17: ...s between emptying the ash space depend on the fuel used and the output need Check the convection section s ash space once a month and remove the ash with an ash scraper as required The intervals between emptying the convection section s ash space depend on the fuel used and the output need Clean the surfaces of the hearth at least once a year Use a round brush with a bent shaft Sweeping the heart...

Page 18: ...es appear sooty they must be swept manually Lift the spirals out of the convection tubes Sweeping the convection section Use a tube brush with a straight shaft Go through each convection tube Push the brush all the way down to the ash space as it will then be easier to pull it back Reinstall the spi rals and close the convection section service hatch Check the pipes in the convection section and r...

Page 19: ...y and the Feed HI and Air Hi settings The burner stops Fault code GOutStrt The burner lit but then went out during pre operation Check the pellet supply and the Feed SU and Air Su settings ServCode The burner stops Fault code ErrorIgn The firing element is not drawing any power Check the connections to the firing element or replace the firing element The burner stops Fault code Tempsens The contro...

Page 20: ...20 2014 03 03 06 DECLARATION OF CONFORMITY ...

Page 21: ... EQUIPMENT No Component Article Number 1 Hearth brush 3487 2 Flue brush 3489 3 Flue brush shaft 3492 4 Heath brush shaft 1356 5 Ash rake 8530 6 Wall stand for cleaning tools 7 Flue gas temperature gauge 5883 8 Flue gas connection D139 mm 5226 ...

Page 22: ...2 Efficiency Draught mm Fan Screw Dealer Installer Installer Date INSTALLATION REPORT After installation the burner must be adjusted with the help of a flue gas analyser If the installation and service measures in the installations and operating instructions are not followed the warranty commitments stated are void Ariterm reserves the right to make changes without separate notification ...

Page 23: ...23 2014 03 03 06 WARRANTY For warranty issues Ariterm Sweden AB refers to our local Distributor ...

Page 24: ...24 2014 03 03 06 NOTES ...

Page 25: ...25 2014 03 03 06 NOTES ...

Page 26: ...26 2014 03 03 06 NOTES ...

Page 27: ...27 2014 03 03 06 NOTES ...

Page 28: ...ORGANISATION CERTIFIED BY All Rights to modifications and corrections reserved ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Reviews: