ARITERM SWEDEN AB
Installation, Operation & Maintenance -
2009.02.18- 7/32
The boiler shall be positioned and installed according to the building rules in force.
Before installing the boiler, the chimney must be controlled for underpressure and
possible risk of condensation. It is possible that an air draught compensator has to be
installed. Inner pipe is recommended for minimizing the risk of condensation.
Space needed for installation: Minimum clearance in front of the boiler (burner inclu-
ded) is 1000 mm. Clearence on the top and at least by the other side of the boiler shall
be at least 0,5 m. The boiler must be level. If the floor is uneven, adjustments can be
made with the help of four adjusting bolts (enclosed with the boiler) that shall be fit-
ted to the bottom plate of the boiler. The air intake duct to the boiler room must have
at least the same area as the flues.
Chimney installation
To embed the angular tube in the chimney, proceed according to the drawing below.
If the tube is embedded as described, you will be able to avoid soot leakage when the
chimney is being swept.
Flue connection and combustion air intake
The combination flue of the boiler allows for connection towards the top as well as to
the rear. Boiler cement is suitable for sealing. Recommended flue gas requirements for
B 20/30: brick chimney lined with a Ø 100 mm (130 mm for 30) acid proof
thin-walled tube or an acid proof Ø 100 mm:s (130 mm for 30) element chimney.
Recommended underpressure for B 20 is 20 Pa (25 Pa for 30). The height of
the gas flue shall be dimensioned according to the building’s requirements, but should
be at least 5 m for B 20 (6 m for B 30). If condensation water comes
out of the flue, a condensate drain pan shall be installed in the lower portion of the
chimney. The combustion air intake must not be covered.
ATTENTION!
The chimneysweep must
be notied for inspection of the flue.
CAUTION!
The boiler has low flue
gas temperatures, which, under certain
conditions,might lead to condensation of
flue gases.
INSTALLATION
30
Mortar
Flue pipe
30 mm incom-
bustible
insulation
Imbedment into chimney
A = 1560 mm
(exkl ställbara
fötter)
Golv
Ø200 mm
Water piping shall be carried out in accordance with current local and national hot
water and building regulations. Safety equipment shall be installed in accordance with
regulations in force.
If a closed expansion vessel is used, an approved safety valve, a pressure gauge, and a
vent valve shall be fitted. The safety valve shall be fitted just above, but not directly on,
the boiler in such a manner that the connection with the boiler cannot be closed off.
The connecting line from the boiler to the safety valve must rise continuously. Before the
boiler is filled with water, the enclosed drain tap shall be fitted.
Radiator system and expansion vessel
When you fill the system, all valves must be open and the external circulation pump
turned off. Bleed the system carefully while filling. When the installation has been in
service for a few days, it shall be bled and refilled once again.
ATTENTION!
See also separate instructions for filling of water.
The volume of the expansion vessel is determined as follows:
Open system:
5% of the water volume in the heating system.
Closed system:
Select the volume of the vessel in accordance with the manufacturer’s instructions.
In the following table, you will find examples of suitable closed system expansion
vessels.
WATER PIPING
System volyme
Opening pressure
Initial pressure
Vessel volyme in litre
litre*
bar
bar
70˚C
90˚C
500
1,5
0,5
35
80
1000
1,5
0,5
80
140
1500
1,5
0,5
80
140
2000
1,5
0,5
140
200
An open system with 500 litre water volume demands at least a 35 litre expansion vessel and a 1500
litre system volume a 80 litre expansion vessel.
* System volume = boiler storage tanks + piping radiator volume.
Summary of Contents for Biomatic plus 50
Page 10: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 10 32 WIRING DIAGRAM ...
Page 28: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 28 32 NOTES ...
Page 29: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 29 32 NOTES ...
Page 30: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 30 32 NOTES ...