Planning and installation
Planning and installation shall be carried out in a professional manner, attention being
paid to general and local rules and regulations. Operating pressure is max. 1,5 bar.
Before taking the installation into service, and always at the beginning of the heating
season, the following checks shall be carried out:
that the heating system is filled and bled
•
that the circulation pump is working
•
that the system valves are open
•
that the automatic control and safety devices are in working order
•
that the chimney has the necessary draught and that the fresh air ventilation
•
is open.
Safety valve
If a closed expansion vessel has been installed in the radiator system, the safety valve
must be checked 4 times a year. Activate the valve by pressing or turning the control
button and check that water escapes from the overflow pipe connecting the valve to
the drain.
Elecktrical installation
The connection is made in accordance with the wiring diagram annexed to this ma-
nual. Also the use of a safety switch (burner switch) is recommended. The other con-
nection cable delivered with the burner is for boiler temperature and flue gas sensors.
Work on the burner may only be carried out by a qualified serviceman. Make sure to
cut the power supply to the burner before servicing.
Before you begin heating, the heating system must be filled with water.
To fill the system, do as follows:
Open all shut-off valves, including the shunt valve. The pump must be switched
1.
off.
Fill the boiler and the radiator system with water. Bleed the system at the radia-
2.
tors.
Once the system is filled completely, the circulation pump can be started and
3.
heating can begin.
When the boiler water has reached its pre-set operating temperature, the pump
4.
should be stopped and the system bled at the radiators once again. This should be
repeated several times.
Remember that much air is enclosed in tap water. The enclosed air volume may reach
as much as 10%, which explains why bleeding takes time – especially where there are
large water volumes. A closed system shall be filled until the pressure gauge indicates
the correct system pressure, i.e. the distance from the pressure gauge to the highest
radiator in meter times 0,1 which gives the system pressure in bar.
Adjust the red needle of the pressure gauge to the same value as the big needle.
Heating with electric heating element
Ariterm B 20 and B 30 has been fitted with a factory wired 3-phase
6/9 kW electric heating element. The power of electric heating elements can be ad-
justed in service menu.
FILLING OF WATER
WATER PIPING
Summary of Contents for Biomatic plus 50
Page 10: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 10 32 WIRING DIAGRAM ...
Page 28: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 28 32 NOTES ...
Page 29: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 29 32 NOTES ...
Page 30: ...ARITERM SWEDEN AB Installation Operation Maintenance 2009 02 18 30 32 NOTES ...