INSTALLATION, OPERATION AND MAINTENANCE

• Bionet 12

Summary of Contents for Bionet 12

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE Bionet 12 ...

Page 2: ...ding authorities Sweeping According to the fire protection laws a chimney shall be swept regularly This is done by the local chimneysweep Sweeping of the boiler shall be carried out in such a manner that good operating economy is achieved see under Maintenance Prepare to chimney sweeping by turning off the boiler at least one hour before cleaning to minimize the amount of glowing ash Warning Make su...

Page 3: ...ing pellets 12 kW Dimension Dimensions width x depth x height Weight Water contents 436 x 581 x 1340 mm 125 kg 50 l Design values Design pressure Design temperature Recommended draught 0 5 1 5 bar max 100 o C 5 20 Pa Connection Expansion Drain Flue pipe connection DN 25 male DN 15 female Ø 102 mm ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 3 12 DIMENSIONS ITEMS INCLUDED IN ...

Page 4: ... pump or solar energy powered systems The 12 kW output is sufficient for most detached house heating systems For domestic hot water needs the Bionet can beneficially be connected to a separate hot water storage system pre prepared for solar energy Ariterm Bionet s compact shape permits instal lation even in tight spaces Shunt connection The water from the boiler tank and the return water are mixed in...

Page 5: ...örvärmning 1 2 1 3 7 8 4 6 5 13 10 11 9 14 11 12 vv kv kv 7b Hot tap water Bionet does not have an in built function for hot water through the taps Hot water is produced for example through a separate solar heating tank or equivalent please refer to relevant drawing Note Before starting any work on the boiler please switch the mains power to the boiler off to ensure that no electrical current runs ...

Page 6: ...notied for inspection of the flue CAUTION The boiler has low flue gas temperatures which under certain conditions might lead to condensation of flue gases 30 Mortar Flue pipe 30 mm incom bustible insulation Water piping shall be carried out in accordance with current local and national hot water and building regulations Safety equipment shall be installed in accordance with regulations in force If...

Page 7: ...d setting 80 C The temperature on the boiler must never be set so low that condensation forms in the boiler Before you begin heating the heating system must be filled with water To fill the system do as follows 1 Open all shut off valves including the shunt valve The pump must be switched off 2 Fill the boiler and the radiator system with water Bleed the system at the radiators 3 Once the system is fil...

Page 8: ...d loosen the hose and electric connections Pull out the burner and remove the ash by brushing the walls of the combustion chamber Empty the ash box The burner Carry out checks and measures when needed or in connection with boiler cleaning When new pellet fuel is used always check the burn pot for sintered ashes crust of ash or gravel and stone like particles Such particles must be removed from the...

Page 9: ...re penetration Take special care to avoid damp penetration through the walls and floor It is also important that pellets are not exposed to direct contact with water in the form of rain or condensation Pellets do not however absorb moisture from surrounding moist air and can therefore be stored outdoors as long as they are under cover The fuel store should be planned according to your estimated con...

Page 10: ...n high low and min modes be tested manually Returning to normal position Press minus key once ATTENTION In this function the burner won t stop when the boiler water reaches desired temperature boiling risk Flue gas temp High CO Retailer Installer Installed by Inst date O2 CO2 Efficiency Draught mm Fan Effect Flue gas temp Low CO O2 CO2 Efficiency Draught mm Fan Effect Flue gas temp Min CO O2 CO2 E...

Page 11: ...ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 11 12 NOTES DECLARATION OF CONFORMITY ...

Page 12: ...ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...