10
PREPARATIONS
10
PREPARATIONS
Preparations
Site preparations
3ULRUWRLQVWDOODWLRQRI&ODVVLF/LQHEDWKWXEWKHÀRRUDQGZDOOVZLWKLQWKHUHTXLUHGDUHDPXVWEH
¿QLVKHGVHHWKHLQVWUXFWLRQLQWKH6LWH3UHSDUDWLRQGRFXPHQW
6WHSVEHIRUH¿UVWXVH
(8 steps)
1. Make sure that the Classic Line 2 bathtub has been installed according to the Assembly and
Installation Instructions.
2. Check that all parts of the product are supplied. Compare to section Parts designation on page
12. If any part is missing or damaged – do NOT use the product.
3. Read the IFU.
4. Perform a functionality test according to section Care and preventive maintenance on page 46.
5. Disinfect the product according to section Cleaning and disinfection on page 34.
6. Choose a designated area, where the IFU should be kept and is easily accessible at all times.
7.
Make sure the thermostatic mixer has been calibrated according to the Assembly and Installation
,QVWUXFWLRQVE\DQ$UMRWHFKQLFLDQRUTXDOL¿HGSHUVRQQHO
8. Make sure to have a rescue plan ready in case of a patient emergency.
WARNING
7RSUHYHQWVFDOGLQJPDNHVXUHWKDWWKHZDWHUPL[HUKDVEHHQFDOLEUDWHG&RQ¿UPWKDW
responsible organisation has established calibration routines.