15
Assembling Instructions
Mounting the Mobile Track
The 4-Post Semi-Permanent Rack system is designed to receive a track lift for safe patient
transfers. The track lift is installed on a mobile track that allows the lift to move within the area
spanned by the 4-Post system.
Once all four fixed tracks are joined to their corresponding posts:
17. Slide the mobile track onto the wheeled trolleys suspended under the parallel fixed tracks.
Be sure to include the end stoppers that came wrapped with the XY trolley kit in the right
sequence and direction (see Fig. 13 and Fig. 14).
Fig. 13