Parameter Meaning
iS1
Set point for inserction probe for the first phase
When the temperature measured by the insert probes reaches this value, the current phase is
finished and next one starts
rS1
Chamber set point for the first phase
It prevents temperature from reaching a too low value. This value controls the operation of the
compressor
Pd1
If the cycle is timed for the first phase
It is considered if the insert probe is not present (OFF to 4h 00Min., res 10Min.) at the end of this time
it switches to next phase.
If the cycle is temperature for the first phase
This value is used only if there is an insert probe; this is the maximum duration of the first phase if
the temperature defined in parameter iS1 is not reached.
iS2
Set point for insertion probe for the second phase
When the temperature measured by the insert probes reaches this value, the current phase is
finished and the next one started.
rS2
Chamber set point for the second phase
It prevents temperature from reaching a too low value.This value controls the operation of the
compressor.
Pd2
If the cycle is timed for the second phase
It is considered if the insert probe is not present (OFF to 4h 00Min., res 10Min.) at the end of this time
it switches to next phase.
If the cycle is temperature for the second phase
This value is used only if there is an insert probe; this is the maximum duration of the second phase
in the event the temperature in the parameter iS2 is not reached.
HdS
Set point of the hold phase
8. CLEANING, CARE & MAINTENANCE
Routine maintenance
Switch OFF and disconnect from the power supply
before cleaning.
• Clean the enclosure and interior of the appliance
as often as possible.
• Blast chiller maintenance must include at least
one daily cleaning of the loading zone to prevent
the development and accumulation of bacteria.
• Before cleaning the chamber, perform a defrost
cycle leaving the door open and removing the
drain plug.
• Blast chiller defrosting cycle is performed in
manual mode and can be performed with open
door
• After the appliances finishes the blast chilling/
freezing cycle, the drain plug of the waste water
must be removed so that the condensate water
will flow into the tank. The drain pipe also serves
to drain out any liquids of the product.
• At the end of each defrost cycle check the water
level and if necessary empty the tray (located un-
derneath the unit).
• Clean the unit with moist cloth. Never allow the
switch, control panel, cable or plug to get wet.
• Do not use abrasive cleaners, products contain-
ing chlorine, caustic soda, muriatic acid, vinegar
and chlorine bleach. These can leave harmful
wastes. Use only neutral soap and water.
• Clean the door seal with water only.
• Ensure that no cleaning water penetrates into
the electrical components.
19
EN
Summary of Contents for 236123
Page 23: ...How to reverse the door 23 EN ...
Page 24: ...24 EN ...
Page 50: ...Jak zamienić stronę otwierania drzwi 50 PL ...
Page 51: ...51 PL ...
Page 55: ...55 ...