Installation Instructions

Unpacking and Inspection

• 

The unit was tested and inspected prior to packing and 

was in perfect condition at the time at time of despatch. 

• 

The unit should be inspected upon delivery for 

possible external damage incurred during transport. 

If damage is evident it should be noted on the freight 

docket and contact is to be made with the Armcor 

Air Solutions sales office. A claim should be lodged 

with the shipping company within 3 days if goods are 

damaged or incomplete. No claims will be recognised 

after this date.

•  IF MAJOR DAMAGE IS APPARENT, DO NOT INSTALL UNIT 

ON TO SITE WITHOUT PRIOR APPROVAL FROM ARMCOR.

• 

Check unit rating plate to ensure the correct unit 

matches the job specifications.

Unit Handling

• 

Protective crating or packaging and the pallets 

should not be removed until the unit is at the point of 

installation.

• 

When removing packaging or crating, be careful not 

to damage, scratch or dent the unit.

• 

After removal of packaging, all removable access panels 

should be opened to inspect for unit internal damage.

Lifting with a Crane

•  SAFETY

 – when installing or working on equipment, 

always adhere to safety codes and guidelines. 

Wear safety goggles, work gloves, work boots and 

protective clothing.

• 

All units should be lifted into position using 

SLINGS

 

and not 

CHAINS

. (Chains may damage exterior finish 

on the fan unit).

• 

Where units must be craned into position, installers 

must check unit weight is within the safe tolerance of 

the working capacity of the crane.

• 

Prepare for lifting with spreaders as you would do 

with lifting air conditioning equipment.

• 

When lifting equipment never stand under the load.

• 

Beware of lifting equipment on to roof areas in windy 

conditions. Only lift when weather conditions are 

favourable.

Lifting with a Forklift

• 

Exercise extreme caution when lifting with a forklift. 

Do not exceed the height limit of the forklift and 

never allow the forklift forks to make contact directly 

with the bottom panel of the unit.

• 

Make careful consideration of the unit’s centre 

of gravity and distribute the weight equally 

on both forks. Test load to see if the weight is 

equally distributed. Do this by lifting the unit a 

few centimetres off the ground level and checking 

stability before lifting any further or before 

transporting the unit.

Suspending the Unit

• 

Before suspending the unit, check the supporting 

beams have sufficient load carrying capacity to 

support the weight of the unit. Equipment is supplied 

with brackets to support the unit.

• 

We recommend that all compact multiflow units 

be suspended or supported with suitable mounting 

springs to eliminate the transmission of vibration.

• 

At each corner of the unit, there are 6mm bolts and 

captive nuts. The bolt can be removed and a hanging 

bracket attached to this fixing point if required.

Hanging Bracket Fixing

• 

Remove 6mm corner bolt.

• 

Align bracket and re-fit corner bolt.

• 

Secure with two additional self-drilling screws 

through base

6               Armcor_XCM–Compact Multiflow ERV Installation and Operation Manual 2021   

Summary of Contents for XCM1225

Page 1: ...Installation and Operation Manual XCM COMPACT MULTIFLOW ERV XCM125 XCM1225 M ADE A U STRALI A N Manufactured byArmcor M ADE A U STRALI A N Manufactured byArmcor...

Page 2: ...Mains Power Supply and Fusing Equipment Layout 8 OPTIONS FOR EVERY INSTALLATION XCM With Centrifugal Fans General Maintenance 12 General Monthly Maintenance Schedules Guide to How Frequency According...

Page 3: ...I sec Fan Filter Size mm Number of filters Weight kg Dimensions mm H x W x L XCM125P1 125 EC Plug 395 x 245 x 45 2 65 290 x 690 x 920 XCM225P1 225 EC Plug 395 x 395 x 45 2 80 440 x 690 x 920 XCM325C1...

Page 4: ...overy and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When working on equipment observe precautions in all literature tags...

Page 5: ...nlet and Exhaust Air Outlet The location of the fresh air inlets must adhere to the Australian Standards 1668 2 The fresh air intake should be positioned clear of any objects which could obstruct the...

Page 6: ...heck unit weight is within the safe tolerance of the working capacity of the crane Prepare for lifting with spreaders as you would do with lifting air conditioning equipment When lifting equipment nev...

Page 7: ...commissioning IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE RETURN AND FRESH AIR INTAKES WARRANTY IS VOID IF THE FILTERS ARE NOT FITTED AND REGULARLY CLEANED OR REPLACED Electrical Req...

Page 8: ...conditioned area Exhaust Air Ducted to outside the building or into the roof space if adequate ventilation is available Fresh Air Use a fresh air cowl or grill to introduce fresh air Supply Air Connec...

Page 9: ...ERY Exhaust Air Fresh Air Return Air Supply Air ENERGY RECOVERY Exhaust Air Fresh Air Supply Air Return Air ENERGY RECOVERY Exhaust Air Supply Air Fresh Air Return Air ENERGY RECOVERY Exhaust Air Fres...

Page 10: ...ir ENERGY RECOVERY Exhaust Air Fresh Air Supply Air Return Air ENERGY RECOVERY Exhaust Air Supply Air Return Air Fresh Air ENERGY RECOVERY Exhaust Air Return Air Fresh Air Supply Air ENERGY RECOVERY E...

Page 11: ...Take care not to damage the heat exchange modules Check the fan wiring is connected and will not interfere with fan operation Note On XCM625 and XCM925 the top panel of the unit will need to be remove...

Page 12: ...to Usage is Established Disposable Corrugated Filters Standard disposable corrugated filters should last approximately one month in normal commercial use with 8 hours per day continuous operation or l...

Page 13: ...ltage is available on all phases Check overload settings are correct if applicable Filters Check that both the fresh air and return air have adequate filters before starting unit Starting Unit Check F...

Page 14: ...Air Flow L s Total Fresh Air Inlet Air Flow L s Total System external resistance Pa Measured downstream of fan outlets Estimate of Fresh Air Make Up or L s Electrical Supply Voltage Supply Fan Motor...

Page 15: ...eplace as necessary Dirty contactor controls Clean and or replace Tripped Circuit Breaker Short circuit Trace and correct Earth leakage or over heating cables due to high load Meggar and replace as ne...

Page 16: ...identifying a warranty claim Freight and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pipe run between units the condensation...

Page 17: ...Notes Armcor_XCM Compact Multiflow ERV Installation and Operation Manual 2021 17...

Page 18: ...Notes 18 Armcor_XCM Compact Multiflow ERV Installation and Operation Manual 2021...

Page 19: ...compact horizontal low profile heat recovery unit designed for installation within a roof space underfloor or in a plant room Read more here See our product brochure Armcor_XCM Compact Multiflow ERV...

Page 20: ...Fresh Air Indoors For more information W armcor com au E sales armcor com au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047...

Reviews: