36
6.5
Exercise B: Broad Crested Weir
Objective
To determine the relationship between upstream head and flowrate for water flowing over
a Broad Crested weir (long base weir).
To calculate the discharge coefficient and to observe the flow patterns obtained.
Method
By using the Broad Crested weir installed in the C4-MkII flume and operating the flume
under a range of flow conditions.
Equipment Required
Armfield C4-MkII Flume
Broad Crested Weir model
Two Hook and Point Gauges, 300mm scale
Armfield F1-10 Hydraulics Bench
Stopwatch (for flow measurement using F1-10 volumetric tank)
Optional Equipment
Direct reading flowmeter
C4-61 Pitot tube and manometer (for velocity measurement)