71
6.14
Exercise L: Flow Over a Dam Spillway
Objective
To observe the flow patterns associated with the flow of water over a dam spillway
Method
By operating the C4-MkII flume with the dam spillway fitted, using with different shapes
of spillway toe.
Equipment Required
Armfield C4-MkII Flume
Two Hook and Point Gauges, 300mm scale
Dam spillway C4-64 with different toes (optional accessory):
Blended Reverse Curvature Toe
Ski Jump
Sloping Apron
Armfield F1-10 Hydraulics Bench
Stopwatch (for flow measurement using F1-10 volumetric tank)
Optional Equipment
Direct reading flowmeter
C4-61 Pitot tube and manometer (for velocity measurement)