Installation
17
S12-MKII-G or S12-MKII-50-G
The equipment requires connection to a single phase, fused electrical supply. The
standard electrical supply for this equipment is 230V, 60Hz. Check that the voltage
and frequency of the electrical supply agree with the label attached to the supply
cable on the equipment.
The equipment is supplied with an appropriate plug fitted so it will not be necessary
for an electrician to terminate any bare electrical connections when installing the
equipment. For information the supply cable and electrical wiring use the following
convention:
GREEN/YELLOW - EARTH
BROWN - LIVE (HOT)
BLUE - NEUTRAL
Supply fuse rating - 5 AMP
Cold Water Supply
The sump tank must be filled with clean cold water before use or after draining for
maintenance. It is not necessary to provide a permanent connection to the cold water
supply.
Laboratory Drain
A drain will be required at floor level for draining the system during maintenance
using the drain valve (6) at the base of the sump tank. It is not necessary to provide a
permanent connection from the drain valve (6) to the drain.
The overflow connection (2) on the side of the sump tank should be permanently
connected to a floor level drain to ensure that the sump tank does not over fill during
operation.
Installing the PC Software (Version S12-MKII-50 only)
If it is required to operate S12-MKII using the optional software supplied with S12-
MKII-50 then it will be necessary to install the software from the CD-ROM supplied
with S12-MKII-50 onto an appropriate PC (PC not supplied).
For instructions on how to install and run the software insert the CD-ROM into the
optical drive on the PC (PC not supplied) then choose ‘Help’ from the menu.
After installing and running the software on the PC, instructions on how to operate
the software can be obtained by choosing the ‘Help’ tab in the top right hand corner
of the screen as shown below:
Summary of Contents for S12-MKII
Page 1: ...Advanced Environmental Hydrology System Instruction Manual S12 MKII ISSUE 21 February 2014...
Page 4: ......
Page 8: ...4 Equipment Diagrams Figure 1 Front View of S12 MKII Hydrology System...
Page 9: ...Equipment Diagrams 5 Figure 2 Plan View of S12 MKII Hydrology System...
Page 10: ...Armfield Instruction Manual 6 Figure 3 End View of S12 MKII Hydrology System...