57
I
NSTALLATION
S
PRING
RT
MODELS AND BATTERY BOX
1. Put the bracketes and the bracket extension together
2. Slide down the UPS and the battery box vertically and put two UPS stands at the end of the tower.
3. Place the UPS and battery box into two stands carefully.