- 29 -
INSTALLATION REQUIREMENTS
Bear the following indications in mind when installing the UPS:
The UPS must be placed on a flat and stable surface.
Do not install the UPS in places exposed to direct sunlight or hot air.
Ensure that the environmental temperature remains between 0°C and 40°C.
Environmental humidity must not exceed 90%.
Avoid dusty environments.
Place the UPS at least 5cm from the surrounding walls so as to allow adequate air circulation.
Ensure that the UPS or any other heavy object is not placed on the power cable.
The cables that connect the loads to the UPS must be maximum 10 Mt long.
INSTALLING THE UPS
Inspection
Inspect the UPS on delivery. The packaging can be recycled and has been designed to guarantee safe
transportation of the unit, so keep it for future use or dispose of it in the appropriate manner.
Installation
Install the UPS ensuring that all the installation requisites are respected.
Connection to the Mains
Connect the input power plug to the mains outlet using the IEC-Shuko power cable supplied in the
packaging.
Battery Charge
The UPS will recharge the battery every time it is connected to the mains power supply. For optimum
results, charge the battery for 6-8 hours before using it for the first time.
Connecting the Loads
Connect the loads (computer, monitor, etc.) to the output plugs on the rear of the UPS using the IEC-IEC
cables supplied.
Warning: Do not connect laser printers or photocopiers to the UPS (on models with power rating lower
than 1500VA). These units occasionally absorb a greater amount of power than when they are in stand-by
mode, an event that could overload the UPS.
Summary of Contents for Syncro 1000
Page 12: ...12...
Page 24: ...24 SCHEMA A BLOCCHI GENERALE...
Page 25: ...25...
Page 37: ...37 MAIN BLOCK DIAGRAM...
Page 38: ...38...
Page 50: ...50 HAUPTBLOCKDIAGRAMM...
Page 51: ...51...
Page 63: ...63 SCH MA FONCTIONNEL PRINCIPAL...
Page 64: ...64...
Page 76: ...DIAGRAMA DE BLOQUE PRINCIPAL...
Page 77: ......