background image

717100311

BASE KIT
Model No. FDN54

Owner's Manual & Assembly Instructions

           QP01

NOTE:

  THIS KIT IS NOT SELF

SUPPORTING.  SEE IMPORTANT

INSTRUCTIONS ON BACK COVER

CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.

Summary of Contents for FDN54

Page 1: ...ELF SUPPORTING SEE IMPORTANT INSTRUCTIONS ON BACK COVER CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS ...

Page 2: ...ance on your kit 7 BASICTOOLS No 2Phillipsscrewdriver pliers workgloves tapemeasure levelandaspadeorshovel 8 GROUND MUST BE LEVEL 9 DO NOT STEP ON CHANNELS OR ANGLES UNTIL FLOORING MATERIAL IS IN PLACE 10 Separate contents of the carton by the part number while reviewing parts list Check to be sure that you have all the necessary parts for your kit If you find a part missing include the model numb...

Page 3: ...t Works QO03 DECKINGMATERIAL NotSupplied BASEKIT Assemble Floor Frame Assemble Base Kit Attach Floor Frame assembly to Base Kit Attach decking material inside Floor Frame assembly FLOORFRAME of Storage Building 10x9 Illustrated ...

Page 4: ...ons following dimensions shown with screws 5 3 Carefully turn unit over and fasten opposite side connections using screws 4 Fasten three corner angles 0572 to corners of unit at the 18 45 7 cm dimension with screws 5 Fasten gusset 6481 to the front right hand corner of unit at the door opening using screws STEP 1 STEP 3 STEP 4 STEP 2 6 4 8 1 0 5 7 2 18 45 7 cm STEP 0572 9784 9783 21 53 3 cm 9784 9...

Page 5: ...ructions and anchor front and rear floor frames at dimension shown to side channels and side floor frames to cross chan nels using bolts and nuts If you are using the base kit as a finished form to pour concrete see next page Pour concrete first then attach the floor frame assembly using concrete an chor bolts available at your local building supply store SIDES REAR USE SLOT 2 5 1 cm 2 5 1 cm 5x4 ...

Page 6: ...round To prepare the earth bed remove sod and other organic debris level the high spots with a flat shovel and tamp the bed down LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL 5 8 15 5 MM MINIMUM THICK NESS NOTE Pressure Treated Lumber must not be used where it will make contact with your Arrow Products The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Trea...

Reviews: