5
Attach Floor Frame Assembly
QP05
6
Do not fasten decking material at this time!
NOTE:
FLOOR FRAME MUST BE LEVEL AND
SQUARE BEFORE PROCEEDING!
If you are using decking material, complete the floor
frame assembly for the storage building as shown in
the assembly instructions found in the building car-
ton.
Position floor frame assembly on base kit,
equal distance on the sides, front and rear.
Dis-
regard statement in building instructions and anchor
front and rear floor frames at dimension shown to
side channels and side floor frames to cross chan-
nels using bolts and nuts.
*
If you are using the base kit as a finished form to pour
concrete, see next page. Pour concrete first, then
attach the floor frame assembly using concrete an-
chor bolts, available at your local building supply
store.
SIDES & REAR
USE SLOT
2" 5,1 cm
2" 5,1 cm
5x4
(10x9 Illustrated)
*
If there are no anchor holes in floor frames, or they do not line up:
Assemble the base kit to match the floor frames, and drill 1/4" (6 mm)
dia. holes at the cross members for attachment with bolts and nuts
provided.