Finishing Materials

       QP06

USE AS FINISHED FORM TO POUR CONCRETE

REINFORCING
STAKES

 

GRADE LEVEL

EARTH

4" Min.
10,2 cm

CONCRETE

REAR

FRONT

Placement & Amount of Materials

SUGGESTION:  Use remaining decking
material for shelving or an entry ramp.

Finish construction of your storage building following the assembly instructions.

Drill and fasten wood to steel
frames using dry wall screws.

52 1/2" 133,4 cm

717100311

              

  SUGGESTED METHOD

CONCRETE ANCHOR BOLTS

3

FRONT

5 x 4

1-  4x8    1220x2440 MM SHEET

DECK MATERIAL    .22 CUBIC YARD 0,1683 M  CONCRETE

SIDES

38 7/8" 98,7 cm

Select one of the suggested finishing materials.  Be sure Base Kit lies flat on the ground.  To prepare the earth
bed, remove sod and other organic debris, level the high spots with a flat shovel, and tamp the bed down.

LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL (5/8"  15,5 MM  MINIMUM THICK-
NESS)  NOTE:

  Pressure Treated Lumber must not be used where it will make contact with your Arrow

Products.  The properties of Pressure Treated Lumber will cause accelerated corrosion.  If Pressure
Treated Lumber comes in contact with your Arrow Models your warranty will be voided.

6"x 6"  15,2x15,2 cm
REINFORCING MESH

PLASTIC MOISTURE
BARRIER
2"   5,1 cm SAND BED
4"   10,2 cm GRAVEL

     BED

IMPORTANT NOTE:

  If leveling blocks are

required due to uneven ground conditions,
the base kit must be completely supported
along outside perimeter, 

because the kit is

not self supporting.
Plywood rests between floor frames on
the inside flange.

Summary of Contents for FDN54

Page 1: ...ELF SUPPORTING SEE IMPORTANT INSTRUCTIONS ON BACK COVER CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS ...

Page 2: ...ance on your kit 7 BASICTOOLS No 2Phillipsscrewdriver pliers workgloves tapemeasure levelandaspadeorshovel 8 GROUND MUST BE LEVEL 9 DO NOT STEP ON CHANNELS OR ANGLES UNTIL FLOORING MATERIAL IS IN PLACE 10 Separate contents of the carton by the part number while reviewing parts list Check to be sure that you have all the necessary parts for your kit If you find a part missing include the model numb...

Page 3: ...t Works QO03 DECKINGMATERIAL NotSupplied BASEKIT Assemble Floor Frame Assemble Base Kit Attach Floor Frame assembly to Base Kit Attach decking material inside Floor Frame assembly FLOORFRAME of Storage Building 10x9 Illustrated ...

Page 4: ...ons following dimensions shown with screws 5 3 Carefully turn unit over and fasten opposite side connections using screws 4 Fasten three corner angles 0572 to corners of unit at the 18 45 7 cm dimension with screws 5 Fasten gusset 6481 to the front right hand corner of unit at the door opening using screws STEP 1 STEP 3 STEP 4 STEP 2 6 4 8 1 0 5 7 2 18 45 7 cm STEP 0572 9784 9783 21 53 3 cm 9784 9...

Page 5: ...ructions and anchor front and rear floor frames at dimension shown to side channels and side floor frames to cross chan nels using bolts and nuts If you are using the base kit as a finished form to pour concrete see next page Pour concrete first then attach the floor frame assembly using concrete an chor bolts available at your local building supply store SIDES REAR USE SLOT 2 5 1 cm 2 5 1 cm 5x4 ...

Page 6: ...round To prepare the earth bed remove sod and other organic debris level the high spots with a flat shovel and tamp the bed down LAY EXTERIOR PLYWOOD OR ANY SUITABLE DECK MATERIAL 5 8 15 5 MM MINIMUM THICK NESS NOTE Pressure Treated Lumber must not be used where it will make contact with your Arrow Products The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Trea...

Reviews: