1.2
Standard Compliances
The product is designed to meet the following standards.
Table 1-1 Standard Compliances
Standard
Description
UL 60950-1
EN 60950-1
IEC 60950-1
CAN/CSA C22.2 No 60950-1
Legal safety requirements
CISPR 22
CISPR 24
EN 55022
EN 55024
FCC Part 15
EN 300386
NEBS Standard GR-1089 CORE
EMC requirements on system level (predefined Artesyn
system)
ISO 8601
Y2K compliance
NEBS Standard GR-63-CORE
1
ETSI EN 300019 series
1. The blade does not fulfill the “Unpacked Equipment Shock Criteria” as defined in NEBS GR63 4.3.2. During tests
which consisted of dropping the blade from 100 mm height, we observed that on some blades the AdvancedTCA zone
2 and 3 connectors got damaged. Although it was possible to manually repair the connectors and the blade was fully
functional again afterwards, the criteria imposed by the NEBS standard were not fulfilled.
NEBS level three
Product is designed to support NEBS level three. The
compliance tests must be done with the customer target
system.
PICMG 3.0 and 3.1
Defines mechanics, blade dimensions, power distribution,
power and data connectors, and system management
Summary of Contents for ATCA-7360
Page 1: ...ATCA 7360 Installation and Use P N 6806800J07S May 2016...
Page 26: ...ATCA 7360 Installation and Use 6806800J07S About this Manual 26 About this Manual...
Page 36: ...ATCA 7360 Installation and Use 6806800J07S Sicherheitshinweise 36...
Page 43: ...Introduction ATCA 7360 Installation and Use 6806800J07S 43...
Page 44: ...Introduction ATCA 7360 Installation and Use 6806800J07S 44...
Page 66: ...Installation ATCA 7360 Installation and Use 6806800J07S 66...
Page 258: ...Supported IPMI Commands ATCA 7360 Installation and Use 6806800J07S 258...
Page 284: ...Replacing the Battery ATCA 7360 Installation and Use 6806800J07S 284...
Page 287: ......