JL686A, JL685A, JL684A, JL683A, JL682A
Kit number 5300-1029
◦
four rubber feet
◦
two rack-mounting brackets
◦
screw kit (eight 8mm M4, four 12-24)
JL681A switches
Kit number 5300-1030
◦
four rubber feet
◦
two 4.5 in. rack-mounting brackets
◦
screw kit (eight 8 mm M4; four 12-24)
◦
three wall/table mounting screws/anchors and cable tie
JL680A switches
Kit number 5300-1031
• four rubber feet
• three wall/table mounting screws/anchors and cable tie
Japan Power Cord Warning
Installation procedure
These steps summarize switch installation. The rest of this chapter provides details on these steps.
Procedure
1. Prepare the installation site. If you have not already done so, carefully read the chapter describing Site
preparation and switch installation precautions
2. Verify that the switch passes self-test.
3. Mount the switch.
4. Connect power to the switch.
5. Connect the network devices.
6. (Optional) Install SFP transceivers. Depending on where you install the switch, it may be easier to
install the SFPs first. SFPs can be hot-swapped—they can be installed or removed while the switch is
powered on.
Chapter 4 Installation overview
23