NOTE: Use only Aruba transceivers in 1930 switches. Using any other transceivers is done at
your own risk and may void support and warranty.
1. Prepare the installation site
If you have not already done so, carefully read Site preparation and switch installation precautions. Be
sure to follow the provided guidelines to ensure proper operation when installing the switch into a network:
2. Verify the switch passes self test
Before mounting the switch, verify it is working properly by plugging it into a power source and confirming
that it passes self test.
Procedure
1. For JL680A switches, connect the AC/DC adapter’s power cord to the power connector on the back of the
switch, and then plug the AC/DC power adapter into a nearby, properly grounded electrical outlet.
For JL681A, JL682A, JL683A, JL684A, JL685A, and JL686A switches, connect the power cord supplied
with the switch to the power connector on the back of the switch, and then into a properly grounded
electrical outlet.
24
Aruba Instant On 1930 Installation and Getting Started
Guide