10.
Adjust the stabilizer bar to
the correct distance and
secure it again with two
locking pins. This stabilizer
bar must sit horizontally.
11.
Place the next post about
2.5 meters further on.
12.
Insert the net frame into the lower hook.
When doing so, make sure the flap is on the roof side.
13.
Place the net against the post and press the clamp cap with the hook around the top tube.
Make sure the blocking bolt shoots back into the hole.
14.
If you want to attach more lengths of net, repeat steps 1 through 13 until you have enough
nets. You only need to add 1 extra upright per net.
15.
Connect the tubes by sliding them over the pins and securing them with the locking clip.
Please note that there should never be more than
3 meters between the uprights.