Page 14
Version 2.00
Assembly Instruction PLG7
10.
Fitting the limit switches
Draw in the brown charging cable with a draw wire or tape
inside of the handrail between the two stations.
After that run in the brown charging cable through the
white charging point holder and connect it on both stations
with the brass bar.
The next step is to connect the plus terminal of the battery
charger with the brass bar.
The minus terminal of the battery charger is connected
together with the hexagon fixing screw of the charging
point holder onto the handrail.
Finally fix the charging point holder onto the handrail, the
fixing holes are already pre drilled.
The brass bar must be fixed to the charging point holder
using plastic screws.
The final stopping position of the lift at both the upper and
the lower station can be regulated by altering the position
of the brass bar on the white charging point holder.
The brass bar can be moved up or down the plastic bracket
depending on the required final stopping position.