381333–199 F
50 Hanover Road, Florham Park, New Jersey 07932–1591 USA
1 800 937–2726 (ASCO), for service call 1 800 800–2726 (ASCO) www.asco.com
ASCO POWER TECHNOLOGIES CANADA PO Box 1238, 17 Airport Road, Brantford, Ontario, Canada N3T 5T3
telephone 519 758–8450, fax 519 758–0876, for service call 1 888 234–2726 (ASCO) www.asco.ca
5200 S
ERIES
P
OWER
M
ANAGER
X
P
Operator’s
Manual
Catalog 5220D
Power Manager Display, front view –
typical enclosure door mounting.
Rear view – Catalog 5220D Power Manager
Transducer attached to the back of the Display.
Catalog 5220T
Power Manager Transducer only
(without the Display).
Note:
The 5200 Series Power Manager Xp is provided
with a 7000 Series 7ASLS or 7ASLB usually without the
display. Refer to the drawings provided with the switch.
TABLE OF CONTENTS
section-page
INTRODUCTION
General Information
1-1
. . . . . . . . . . . . . . . . . . . .
Measurements & Specifications
1-3 & 1-4
. . . .
Device Ratings
1-5
. . . . . . . . . . . . . . . . . . . . . . . .
INSTALLATION
Mounting
2-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connections
2-2 & 2-3
. . . . . . . . . . . . . . . . . . . . .
Control Overview
2-4
. . . . . . . . . . . . . . . . . . . . . .
Outline Mounting Drawing
627122
. . . . . . . . . . .
Wiring Diagram
629455
. . . . . . . . . . . . . . . . . . . . .
INITIAL SETUP
Password Selection
3-1
. . . . . . . . . . . . . . . . . . . .
System Type, Source, & Language
3-2 & 3-3
.
Frequency, Voltage, & Current Settings
3-4
. . .
PT & CT Ratios
3-5
. . . . . . . . . . . . . . . . . . . . . . . .
Serial Communication Interfaces
3-6 to 3–9
. .
Reset Energy Level & Reset Event Log
3-10
. .
Reset Maximum Demand Level
3-12
. . . . . . . . .
Watt Demand Window Size
3-13
. . . . . . . . . . . .
Setpoint Configuration
3-14
. . . . . . . . . . . . . . . .
Device 86 Configuration
3-15
. . . . . . . . . . . . . . .
KW Setpoints & Reset Time Delay 3-16 & 3-17
Date & Time Setting
3-18
. . . . . . . . . . . . . . . . . . .
Event Log
3-19
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Setup Log & Reset
3-20 & 3-21
. . . . . . . . . . . . . .
Engine Run Time Counter & Reset
3-22
. . . . . .
OPERATING THE POWER MANAGER
Operation
4-1 & 4-2
. . . . . . . . . . . . . . . . . . . . . . . .
INDEX
back page
. . . . . . . . . . . . . . . . . . . . . . . . . .
To avoid possible shock, burns, or
death, deenergize all electrical
sources
before
making
any
connections to the Power Manager.
The protection provided by the equipment may be
impaired if the Power Manager is used in a manner
not specified by ASCO Power Technologies.
!