Ascotel® IntelliGate® 2025/2045/2065 as of I7.9
90
Installation
sy
d-
020
4/1.
7
– I7.
9
– 1
2
.2009
4. 6. 2. 2
Connection to a universal building cable installation
(UBC)
For connecting the PBX indirectly to the universal building cabling, provide the fol-
lowing connection points in the main distribution frame:
Tab. 33
Connection points per interface
Interface
Connection points
per interface
Connecting cable
S/T
4
)
a/b
2
)
AD2
2
)
T2
4
Patch cable, straight Cat. 5
(see
Ethernet interface
4
Patch cable, straight Cat. 5
(see
V.24
9
Modem cable (see
)
General Bell
2
16-wire connecting cable (see
Switch group interface 1
2
Connecting cable (see
)
Freely connectable relay
6
Connecting cable (see
)
Door intercom interface 1
16
Connecting cable (see
)
Door intercom interface 2
16