EN
12
Ø 1 mm
Ø 6,35 mm
Pool Chemicals Connection
At this step is necessary to connect the injecting valves of individual chemicals
to the dosing pumps and dosed agents.
Place the injecting valve in the T-joint, blinded with the
DN50 G1/4” threaded
plug #12134.
1.
Cut the PE tube at 90 ° angle to ensure proper fi tting.
•
Use the sharp knife to cut plastic. The cut must be clean and smooth.
2.
Drill the 6 mm hole and the 1 mm hole (air suction) into the
OXYPUREcanister cap. Push the PE tube through the cap. Select the
tube distance so that the tube reaches the canister bottom and can be
connected to the pump as straight as possible. A long tube in the canister
would bend and produce air bubbles.
3.
Put a weight on the tube end and dive it in the canister.
4.
Connect the plastic tube from the OXYPUREcanister to the
ASIN AQUA Oxygen pump (marked as 1 CHLORINE) to the left connection.
5.
Connect the plastic tube to the 1 CHLORINE pump right connection and the
injection valve.
6.
Hand screw the OXYPUREinjection valve in the specifi ed mounting hole (see
diagram).
•
The injection valve is installed in G 1/4” thread.
To connect dosing of pH, algaecide and fl occulant, repeat steps 1 to 6 for other
pumps according to their marking.
•
Check throughput of the injection valves and tightness of the entire system
(see installation test).
WARNING:
Only hand tighten. Do not use tongs or any other tools.
T-joint with inserting
DN50 plug G1/4”
threaded
Injecting valve