AMERICAN SPECIALTIES, INC.
441 Saw Mill River Road, Yonkers, NY 10701
(914) 476.9000 • (914) 476.0688
www.americanspecialties.com
MODEL №:
ISSUED:
REVISED:
THIS MANUFACTURER RESERVES THE RIGHT TO MAKE CHANGES IN DESIGN OR DIMENSIONS WITHOUT FORMAL NOTICE
INSTALLATION OF EL-LIGHTING
Connect the two (2) output connector plugs of the 12V AC/DC Adapter with 2 Outputs (provided) into the two
(2) DC Power switches’ sockets (provided) located at the top of the cabinet.
Connect the 12V AC/DC Adapter (provided) to the Quad Outlet (by others).
Turn ON the two (2) DC switches (provided).
INSTALLATION OF FOAM SOAP DISPENSER
Foam Soap Dispenser includes power supply adapter (provided, item 1) to be connected into one of the quad
outlets (by others).
Soap Tank can be filled by removing the soap tank from soap tank holder bracket and unscrewing the cap.
Fill the tank with foaming soaps with a pH in range 7±1.5 and viscosity in range 1 ~ 100 cP (mPa•s).
Close the cap after filling and place the soap tank back to the soap tank holder bracket. Make sure the soap tube
reaches to approximately 1/4" [6] above the bottom of the soap tank through the guide sleeve and it is not bent or
curved.
Refer to OM provided with specific soap dispenser for maintenance instructions.
PAPER TOWEL DISPENSER
Paper towels can be loaded in place. For Z-Fold or Multi-Fold towels use the adapter MFTA-2 (provided).
For C-Fold towels do not use the MFTA-2 adapter and store it inside the cabinet for use at a later time when
towel style may change.
29 JAN 2019
13 MAR 2019
VELARE™ BTM SYSTEM CABINET INSTALLATION GUIDE (PAGE 2 OF 3)
0663-T
FIG. 3
FIG. 4