6
ED7800 Series
Installation Instructions
Concealed Vertical Rod Exit Devices
FM466 04/20
Copyright © 2018, 2020, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in
part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
For installation assistance contact Corbin Russwin
1-800-543-3658 • techsupport.corbinrusswin@assaabloy.com
1.
Push down on active case lever to
be sure top latch and bottom bolt
retract completely and remain
retracted when lever is released.
2.
If bottom bolt does not retract flush
with bottom of door, check “Pin Top
Rod and Bottom Tube” procedure.
7
Test Operation
1. Place case in position. Be sure cases
are level at same height. (Figure 9)
2. Drill and tap for No. 1/4-20 screws.
3. Mount
cases.
8
Install Inactive Case
Figure 7
1. Undog cases. Using key furnished,
back out screw and remove tenon
from active case lever. (Figure 1 on
page 3)
2. Mount active case, engaging hook
under lifting flange. Secure with
screws furnished. (Figure 8)
6
Install Active Case
Figure 8
1. Using access hole, raise lifting flange
for active case so that bottom bolt
is fully retracted. DO NOT PRESS
BOTTOM BOLT FROM BOTTOM OF
DOOR. Be sure that top latch is
retracted.
2. Drill 1/8" diameter hole through rod
and tube using pre-drilled hole in
bottom tube as guide. (Figure 7)
3. Insert hammer-lock cotter pin
through hole and secure with punch
and hammer. Flatten pin head
completely. (Figure 7) Hang door.
5
Pin Top Rod and Bottom Tube
Drill Thru
Guide Hole
Insert cotter pin
and flatten head
completely.
Inserted
Flattened
Hook
Lifting Flange
Figure 9