54
EN
Set-up operation
Initial commissioning
All devices are connected to the
Hi-O Technology
™ for the initial commissioning,
but are not configured yet. If the voltage supply is switched on, the system is in
plug and play mode and the devices work with the factory settings.
Interfaces for locking systems
cannot work with factory settings, because they must
be logically linked to the corresponding Emergency Open push-buttons. The
configuration must be completely finished before the
Interfaces for locking systems
can be commissioned.
Any changes which are made necessitate re-configuration
(
D01104xx ePED
®
Service Software Manual
).
Commissioning
Note!
Set-up:
All Hi-O devices must be connected to the bus for the configuration. Then
the operating voltage is switched on. Subsequently connected devices are only
recognised after renewed connection of the operating voltage.
At least one Emergency Open module is always necessary for operation of the
RWT locking module.
1 Configure the system via the
ePED
®
Service Software
(
D01104xx ePED
®
Service Software
Manual).
Interface for
locking systems
I