background image

INSTALLATION INSTRUCTIONS

1

3

Assemble hanger.  

 

Copyright © 2012, Pemko Manufacturing Co., an ASSA ABLOY Group company. All rights reserved.
Reproduction in whole or in part without the express written permission of Pemko Manufacturing Co. is prohibited.

Overhead Mount

Side Wall Mount

1/2" (13) 

7

Fix both channel bodies into door.

2

5

Connecting end 

Clip Stop 

Insert hangers and
retaining stop.

6

8

4

Mortise door for door guide.

1/4" (6)

9/16"

(14)

CL

Attach a plumb line to hanger. Place hanger inside 
track. Using plumb line, mark the centerline of floor 
channel.

Fit door guide.

LP200_INS • Rev 1 - 09.12

Place nut inside hanger body.
Thread locking nut onto bolt and
then screw bolt into the nut within
hanger. Leave a 1/2" clearance
between the base of the hanger
and bolt head, as shown.

Secure track.

Use one bracket or fastener at 

each end of track and no more 

than 3' in between.

1-9/16" x 8g

3/16" bolt x 21/32"

Route top of door 
at both ends for
channel bodies.

=

=

1-1/4"

(32)

4-11/16"

(119)

1-3/32"

(25)

1-7/32"

(32)

9/16"

(15)

1-9/16"

(40)

4-1/16"

(102)

4-1/2"

(114) 4-17/32"

(119)

Locking Nut

Slider

Hanger

Strap Bolt

Ensure 102N guide is running 
in the routed guide slot in the 
base of the door.

Position and adjust door height.

Ensure

slider is in

highest position.

Adjust

door

height.

Reviews: