INSTALLATION INSTRUCTIONS
1
3
Assemble hanger.
Copyright © 2012, Pemko Manufacturing Co., an ASSA ABLOY Group company. All rights reserved.
Reproduction in whole or in part without the express written permission of Pemko Manufacturing Co. is prohibited.
Overhead Mount
Side Wall Mount
1/2" (13)
7
Fix both channel bodies into door.
2
5
Connecting end
Clip Stop
Insert hangers and
retaining stop.
6
8
4
Mortise door for door guide.
1/4" (6)
9/16"
(14)
CL
Attach a plumb line to hanger. Place hanger inside
track. Using plumb line, mark the centerline of floor
channel.
Fit door guide.
LP200_INS • Rev 1 - 09.12
Place nut inside hanger body.
Thread locking nut onto bolt and
then screw bolt into the nut within
hanger. Leave a 1/2" clearance
between the base of the hanger
and bolt head, as shown.
Secure track.
Use one bracket or fastener at
each end of track and no more
than 3' in between.
1-9/16" x 8g
3/16" bolt x 21/32"
Route top of door
at both ends for
channel bodies.
=
=
1-1/4"
(32)
4-11/16"
(119)
1-3/32"
(25)
1-7/32"
(32)
9/16"
(15)
1-9/16"
(40)
4-1/16"
(102)
4-1/2"
(114) 4-17/32"
(119)
Locking Nut
Slider
Hanger
Strap Bolt
Ensure 102N guide is running
in the routed guide slot in the
base of the door.
Position and adjust door height.
Ensure
slider is in
highest position.
Adjust
door
height.