V1.0 04/02/20
TD0192
Page 9 of 13
This Document is uncontrolled when printed unless over stamped “CONTROLLED DOCUMENT”
5.
Using a marker pen, mark out 4 floor fixing holes for the Plinth base.
6.
Drill the 4 marked holes. Ensure you are using correct PPE including googles and ear protection.
7.
Using 4 fixing points, secure the Plinth to the floor using appropriate fixings.