1. Remove the showerhead from the packaging.
2. Install the showerhead onto the showerhead spout located in the center of
the unit's ceiling. If the spout is loose, tighten it with the locking nut located on
the top of the ceiling.
After completing the assembly of the unit's cabinet you can now proceed to
making the necessary internal plumbing connections.
All of the internal plumbing connections are labeled with a letter indicating the
hose and the intended connection point.
Starting with “A,” connect the hose to the corresponding connection point labeled
“A” and repeat until all of the connections are complete. Make sure you use the
provided gaskets for each hose when making the final connections.
Step 16 Install the overhead showerhead
Step 17 Plumbing connections
32