Ups general description & installation
12
OM226130 Rev. A
3.3 POSITIONING AND INSTALLATION
The UPS must be installed in a clean and dry room, preferably not dusty. The User
must ensure that there is enough air exchange in the room so that the equipment can
be adequately cooled; if this is not guaranteed, the room must be adequately aired.
If the UPS contains the batteries internally the air exchange with the external ambient
will have to be according to EN 50091-1, annex N.
3.3.1 Base plan, static load and weights
Picture 9 - Base plan
20 30 40 60 80
UPS
(kVA)
1Ph e 3Ph
3Ph
L1 – mm
650
P1 – mm
820
L2 – mm
25
1Ph UPS (kVA)
20
30
Weight w/o battery – kg
336
349
Weight with battery
(5 minutes autonomy)
– kg
466 516
Weight with battery
(10 minutes autonomy)
– kg
504 664
Weight with battery
(15 minutes autonomy)
– kg
534
3Ph UPS (kVA)
20
30
Weight w/o battery – kg
325
335
Weight with battery
(5 minutes autonomy)
– kg
481 535
Weight with battery
(10 minutes autonomy)
– kg
495 669
Weight with battery
(15 minutes autonomy)
– kg
549
3Ph UPS (kVA)
40
60
80
Weight w/o battery – kg
389
450
511