6
10cm.
The connector must be fully mated when wiring. If
the cable is too long, it is recommended to fix the
cable to the rack system with a UV-resistant nylon
cable tie. When fixing the cable to the rack, the
bending radius of the cable should not be less than
48mm.
Avoid directly exposing cables and connectors to
sunlight. Please use anti-UV cables.
Do not disconnect the electrical connection when
there is a load.
It is strictly forbidden to try to disassemble the PV
module, and it is strictly prohibited to remove the
nameplate of the PV module or other parts on the
PV module; it is strictly forbidden to paint or apply
any adhesive on the surface of the PV module.
It is strictly forbidden to drill holes in the frame of
the PV module.
It is strictly forbidden to scratch the anodized layer
on the surface of the aluminum alloy frame, except
when it is connected to the ground. Scratches may
cause corrosion of the frame, affecting the frame's
load-bearing capacity and long-term reliability.
If the PV module glass or other packaging
materials are damaged, please wear personal
protective equipment to separate the PV module
from the site or the circuit. It is strictly forbidden to
touch wet PV modules, unless you are wearing
electric shock protection equipment that meets the
requirements.
When professionals replace or repair PV modules,
do not damage the surrounding PV modules or their
support structures.
When cleaning PV modules, you must follow the
cleaning requirements of PV modules.
The connectors must be kept dry and clean to
ensure that they are in good working condition. Do
not insert other metal objects into the connector or
make electrical connections in any other way.
4
Handling and unpacking
If the PV module is not in use, please do not open
the product packaging. The goods should be stored
in a dark, dry and ventilated place. If the PV
modules
are
stored
in
an
uncontrollable
environment, the storage time must be less than 3
months when the outer packaging of the PV
modules is kept intact.
It is recommended to unpack an appropriate
number of PV modules per day according to the
project progress, and the unpacked PV modules
should be installed within a day. If unpacking too
many PV modules and being stacked on the ground,
in severe weather such as heavy rain and typhoons,
the PV modules may be immersed in water for a
long time affecting the reliability of the product or
be scraped away.
4.1
Transport
During the transportation of the PV modules to the
project site, they must be packed in the packaging
box provided by Chint Solar, and they should be
stored in the original packaging box before
installation. Please protect the packaging from
damage.