background image

   
 

 

6   

     

 

 

 

Do  not  disconnect  the  electrical  connection  when 

there is a load. 

 

It is strictly forbidden to try to disassemble the PV 

module,  and  it  is  strictly  prohibited  to  remove  the 

nameplate  of  the  PV  module  or  other  parts  on  the 

PV module; it is strictly forbidden to paint or apply 

any adhesive on the surface of the PV module. 

 

It is strictly forbidden to drill holes in the frame of 

the PV module. 

 

It is strictly forbidden to scratch the anodized layer 

on the surface of the aluminum alloy frame, except 

when it  is connected to  the ground. Scratches may 

cause  corrosion  of  the  frame,  affecting  the  frame's 

load-bearing capacity and long-term reliability. 

 

If  the  PV  module  glass  or  other  packaging 

materials  are  damaged,  please  wear  personal 

protective  equipment  to  separate  the  PV  module 

from the site or the circuit. It is strictly forbidden to 

touch  wet  PV  modules,  unless  you  are  wearing 

electric  shock  protection  equipment  that  meets  the 

requirements. 

 

When  professionals  replace or  repair  PV  modules, 

do not damage the surrounding PV modules or their 

support structures. 

 

When  cleaning  PV  modules,  you  must  follow  the 

cleaning requirements of PV modules. 

 

The  connectors  must  be  kept  dry  and  clean  to 

ensure that they are in good working condition. Do 

not insert other metal objects into the connector or 

make electrical connections in any other way. 

4

 

Handling and unpacking 

 

If the PV module is not in use, please do not open 

the product packaging. The goods should be stored 

in  a  dark,  dry  and  ventilated  place.  If  the  PV 

modules 

are 

stored 

in 

an 

uncontrollable 

environment,  the  storage  time  must  be  less  than  3 

months  when  the  outer  packaging  of  the  PV 

modules is kept intact. 

 

It  is  recommended  to  unpack  an  appropriate 

number  of  PV  modules  per  day  according  to  the 

project  progress,  and  the  unpacked  PV  modules 

should  be  installed  within  a  day.  If  unpacking  too 

many PV modules and being stacked on the ground, 

in severe weather such as heavy rain and typhoons, 

the  PV  modules  may  be  immersed  in  water  for  a 

long time affecting the reliability of the product or 

be scraped away. 

4.1

 

Transport 

 

During the transportation of the PV modules to the 

project  site,  they  must  be  packed  in  the  packaging 

box  provided  by  Chint  Solar,  and  they  should  be 

stored  in  the  original  packaging  box  before 

installation.  Please  protect  the  packaging  from 

damage. 

 

It is necessary to ensure the safety when unloading 

PV modules, especially when hoisting roof projects. 

It  is  forbidden  to  use  lifting  straps  directly  on  the 

pallet  for  hoisting.  The  PV  modules  should  be 

placed in a protective device and then hoisted to the 

roof  to  prevent  the  packing  box  from  deforming 

and  bumping  against  the  wall  during  the  hoisting 

process. 

Special instructions 

Due  to  the  limitation  of  the  height  of  the  container, 

Summary of Contents for CHSM54M(BL)-HC

Page 1: ...1 Crystalline Silicon PV Module Installation Manual...

Page 2: ...1 Transport 6 4 2 Unpack 7 4 3 Stack 7 5 Mechanical installation 7 5 1 Environment 7 5 2 Tilt angle selection 8 5 3 Mounting Guide 8 5 3 1 Bolted mounting 9 5 3 2 Clamped mounting 10 6 Electrical Inst...

Page 3: ...ed with is beyond the control of Chint Solar Chint shall not be liable for any form of loss including but not limited to loss damage casualty or additional cost caused by improper installation operati...

Page 4: ...a or PV module storage area It is forbidden to install or use damaged PV modules It is forbidden to repair PV modules by unauthorized personnel including but not limited to replacing any part of PV mo...

Page 5: ...and be aware of bumps in the corners When installing or repairing the PV system do not wear any metal accessories to avoid the risk of electric shock if it is installed far above the ground please we...

Page 6: ...connector or make electrical connections in any other way 4 Handling and unpacking If the PV module is not in use please do not open the product packaging The goods should be stored in a dark dry and...

Page 7: ...from colliding and scratching with the cement surface hard object on the ground color steel tile metal corrugated etc When the PV modules are stacked they must be neatly and stably stacked on a horiz...

Page 8: ...tion The tilt angle of a PV module refers to the angle between the surface of the PV module and the ground surface as shown in Fig 1 The power output of a PV module is maximized when it faces the sun...

Page 9: ...raction effect therefore the space between two adjacent PV module frames should be no less than 10mm when mounted For detailed installation methods please refer to the following specifications 5 3 1 B...

Page 10: ...e installed across the support frame Fig 8 or parallel to the frame of the photovoltaic module Fig 9 When using clamps to install each module must be secured with a minimum of 4 clamps Fig 8 Rails ove...

Page 11: ...shown in Fig 10 and the fringe clamp shown in Fig 11 and Fig 12 The mid clamp has dimensions of a 40 mm b 26 mm c 5 mm d 28 mm 9 mm For module of 182mm wafer the size of mid and fringe clamp must mee...

Page 12: ...00Pa 2400Pa 5400 2400Pa Installation scope 198 408mm 2400 2400Pa Installation scope 50 200mm CHSM60M HC CHSM60P HC CHSM60M BL HC CHSM60M LV HC 1666 992 35 5400Pa 2400Pa 5400 2400Pa Installation scope...

Page 13: ...M HC CHSM54M BL HC CHSM54M LV HC 1708 1133 30 1708 1133 35 1722 1134 30 1722 1134 35 5400Pa 2400Pa 5400 2400Pa Installation scope 359 50mm 1400 1400Pa Installation scope 200 50mm CHSM6612M CHSM6612M H...

Page 14: ...m voltage for the regular module series is 1000V the 1500V standard products are also available according to the requirements The IEC UL standard maximum system voltage for half cell module series is...

Page 15: ...ge ratings conductor capacities fuse ratings and control sizes for PV output Depending on the maximum rated fuse current of the PV module and the local electrical installation standards the connection...

Page 16: ...ng connectors to direct sunlight and soaking in water Avoid the connectors falling on the ground or the roof Do not plug or unplug the connectors when the PV module is in live state When it is necessa...

Page 17: ...that meet the requirements of UL 467 and is suitable for electrical bonding and grounding of PV modules Other grounding methods may be used when the racking system is tested following the UL 2703 req...

Page 18: ...it is generally not necessary to clean the PV module as the rainfall will provide a self cleaning effect If there is a large accumulation of dirt on the PV module surface that has seriously affected t...

Page 19: ...released in June 2018 Rev 1 1 released in July 2020 Rev 1 2 released in October 2021 CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86 571 5603 1888 Fax 86...

Reviews: