recommended to take the right amount of modules according to the progress of the project 

every day. Heavy rain and other inclement weather may have the potential to soak the 

packaging which can affect product reliability, such as storms, typhoons, hurricanes or other 

events in which they may be blown away. If the users need to store modules before 

installation, do not open the package, the goods should be stored in a room temperature, 

dark, dry and ventilated place. 

1.3.2    Module’s Stack 

a)  When a module is taken out of the box, cardboard bedding below should be applied in order 

to avoid contact with cement surface / ground, hard metal or tile. Modules should be placed 

neatly and should not be dropped, slammed or scratched. 

b)  When stacking modules, it needs to be stacked neatly in the horizontal plane, under the 

condition of the glass facing down and the back way piled up, while the cardboard bedding 

need to be underside the modules. If the modules will be installed on the rooftop, the 

number of each stack is suggested no more than 20. In case of the poor load-bearing 

capacity, it’s recommended that the designer and/or installer check with the structural 

engineer or architect to determine the amount of load allowable for specific location. During 

the whole process, the installation tools and other objects must be prevented from 

contacting the module surface. 

c)  If the modules are requested to be classified by current, the handling personnel are required 

to carry out of the level of the current and make a mark separately according to the power 

on the list. (e.g. 275W-L, identifies the modules of the packaging according to the power on 

the list, indicating a low current position; 275W-H, compared to high current position). 

Usually, the same series of modules in the same current position are required in 

accordance with the system design requirements. 

d)  If the modules are color-coded and marked the corresponding logo on the carton due to the 

customer requirements, when modules are taken out and stacked, they should be labeled to 

avoid confusion. Usually the same row or the same square have the same color according 

to the system design requirements. 

e)  Due to the complexity and difference of the construction site, these precautions may not 

cover all items, please refer to the specific construction standards. 

Summary of Contents for CHSM60M(DG)/F-B

Page 1: ...nt com Crystalline Silicon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 1 3 Precautions for Installation 2 Safety 2 1 General Safety 2 2 Installation Safety 3 M...

Page 2: ...ense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 1 3 Precautions of Installation...

Page 3: ...ooftop the number of each stack is suggested no more than 20 In case of the poor load bearing capacity it s recommended that the designer and or installer check with the structural engineer or archite...

Page 4: ...e modules 2 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 2 1 11 Do not drill holes in the frame or scratch the anodized...

Page 5: ...t the mounting surface touching the junction box 2 2 17 Standing on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 2 2 18...

Page 6: ...s available as shown in figure 3 While installing the module frame should be parallel to the mounting rack to avoid casting shadow on the rear side as shown in figure 4 Figure 1 Figure 2 Figure 3 Figu...

Page 7: ...Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com Figure 5 3 2 2 Clamping on the frame surface 3 2 2 1 Double glass module During the installation of bifacial modules the fram...

Page 8: ...e added for additional support 3 As for above figure 7 indicates the allowable installation range of the aluminum clamp the recommended installation location is 50 200mm For this installation the modu...

Page 9: ...omponents b The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt c If the bars do not come with grooves holes of a suitable diameter may need to be dri...

Page 10: ...roduce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining component cond...

Page 11: ...wire around the bolt Note that the copper wire cannot be attached directly to the aluminum 4 2 4 Put the bolt through the cut washer and then through the hole in the aluminum frame 4 2 5 Add the spri...

Page 12: ...th Dust weather Right away after the dust wind The period of the PV module cleaning shall be determined by the condition of the weather pollution O M operator shall keep a record of weather condition...

Page 13: ...g District Hangzhou P C 310053 Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86...

Reviews: